My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2004-657
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2004
>
Reso 2004-657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:11 AM
Creation date
1/25/2006 1:57:35 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2004-657
Date (mm/dd/yyyy)
04/15/2004
Description
– Award Bid 04-01-01 B.K. Marine Construction, Seawall Repairs.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~" . <br />,\ <br /> <br />CITY OF SUNNY ISLES BEACH <br />SEAWALL RESTORATION & REPLACEMENT SERVICES <br />AGREEMENT CONTRACT NO. 04- 21 Co 7':~,- ('i i <br /> <br />()p. TUS CONTRACTOR AGREEMENT made and entered into this J5 r}L. day of <br />}V, 2004, by and between the CITY OF SUNNY ISLES BEAC , FLORIDA, a <br />municipal corporation of the State of Florida, (hereinafter referred as to "City") and BK <br />MARINE CONSTRUCTION, INC., a Florida corporation, authorized to do business in the <br />State of Florida, (hereinafter referred to as "Contractor"), whose Federal 1.0.# is 59-1816031. <br /> <br />WHEREAS, Contractor is a qualified General Contractor; and <br /> <br />WHEREAS, the City wishes to employ Contractor to replace 183rd Street Seawall, <br />Restore the Atlantic A venue Bridge Revement and Seawall, and other services more particularly <br />described in shown in Exhibit "A" attached hereto and made a part hereof. <br /> <br />WHEREAS, the Contractor is qualified, willing and able to provide the desired services <br />on the terms and conditions set forth herein; <br /> <br />NOW THERFORE, in consideration of the premises and the mutual covenants herein <br />named, the parties hereto agree as set forth below: <br /> <br />1. RECITALS. The Recitals set forth above are hereby incorporated into this Agreement <br />and made a part of hereof for reference. <br /> <br />2. SERVICES TO BE PERFORMED. Contractor shall perform the following services: <br /> <br />a. Sea Wall Replacement and Restoration services performed for the 183rd Street Seawall, <br />Atlantic A venue Seawall and other services more particularly described in shown in <br />Exhibit "A" attached hereto and made a part hereof. <br /> <br />b. Contractor will prepare and present oral/written reports as needed or as requested on a <br />periodic basis while engaged in special projects. Contractor shall provide, on a monthly <br />basis, to the City Manager, a detailed narrative report delineating all services provided by <br />the Contractor in the previous month. The Contractor shall also provide quarterly, <br />written reports, detailing all of the Contractor's activities in the previous quarter and the <br />results of the Contractor's efforts. Each report required herein will be submitted to the <br />attention of the City Manager. <br /> <br />c. The total price for these services shall not exceed Two Hundred and Eighty-Nine <br />Thousand, Two Hundred and Eighty-Two Dollars ($289,282.00) payable: ,~monthly [J <br />as invoiced. <br /> <br />3. TERM. Subject to the provisions relating to the termination of this Agreement as set <br />forth in Paragraph 10 hereunder, the term of this Agreement shall be for Six Months (6) Months <br /> <br />BK Marine Construction, Inc. <br />Attorney/ Agreements/jb <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.