My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2004-710
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2004
>
Reso 2004-710
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 4:26:48 PM
Creation date
1/25/2006 1:57:42 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2004-710
Date (mm/dd/yyyy)
09/09/2004
Description
– Change Order: Weitz Co. for New Government Ctr.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />j-~ <br /> <br />WEITZ <br /> <br />I Construction Change Directive I <br /> <br />TWC, Detailed, Grouped by Number, No Cancelled Items <br />Page 1 of 1 <br /> <br />Sunny Isles Beach Government Center <br />Project # F100002 <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br />Tel: (305) 932.2722 Fax: (305) 932.2996 <br /> <br />Directive Number: 187 <br />Date Created: 7/14/2004 <br /> <br />THE WEITZ COMPANY-FLORIDA IS hereby directed to make the following change(s) In this contract: <br />Added Stucco & Paint at Garage Interior <br />Description: <br />Price as shown is for block filler and paint at interior walls of the garage. NO CEILINGS, NO STUCCO, NO <br />RUBBING & PATCHING. <br />NOTE: There will be a ledge where CMU meets the crash walls and columns. This is not a flush wall. <br />ADD / ALTS: <br />1) Add textured stucco finish to walls only: Add $1 58,928 + OH&P. <br />2) Add prep of beams, cols, and walls at $0.70 per sq. for a add of: 58,679 SF x .70 = $41 ,075.00 + OH &P. <br /> <br />02.C301007_ ,2500 Painting at walls only 1 .00 $41 ,224 $ 41 ,224 <br />02,Y3020_ ,2450 .175% Data Processing 1 ,00 $72 $ 72 <br />02.Y5010_ ,2450 ,825% Bonds & Insurance 1 .00 $356 $ 356 <br />02,Y5050_ ,2450 .90% Sub Guard Insurance 1 ,00 $392 $ 392 <br />02,X301001_ .2450 ~% Over Head 1 ,00 $2,634 $ 2,634 <br />02.Z1020_ .7205 ~,5% Contractors Fee 1 ,00 $1 ,855 $ 1,855 <br /> <br />Total: $ <br /> <br />46,533 <br /> <br />ProDosed Adiustments <br /> <br />1. The proposed basis of adjustment to the Contract Sum or Guaranteed Maximum Price is: <br />[X] Lump Sum increase of $46,533 <br />[ ] Unit Price of per <br />[ ] As provided in Subparagraph 7,3,6 of AlA Document A201, 1997 Edition. <br />[ ] Time and Material not to exceed <br />[ ] as follows: <br /> <br />2. The Contract Time as a result of this work will be increased by 30 days. <br />3. Approval Required by 9/112004 in order to not delay the project. <br />Upon execution by the Architect and Owner, this directive shall be effective immediately, <br /> <br />ARCHITECT <br />Address: <br />By: <br />Date: <br /> <br />OWNER <br />Address: <br />By: <br />Date: <br /> <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.