My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2004-737
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2004
>
Reso 2004-737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 4:31:19 PM
Creation date
1/25/2006 1:57:46 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2004-737
Date (mm/dd/yyyy)
11/18/2004
Description
– Undergrounding Engineering Study by FPL: $22,680.00.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RESOLUTION NO. 2004- '13'1 <br /> <br />A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES <br />BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXPEND THE SUM <br />OF TWENTY-TWO THOUSAND SIX HUNDRED EIGHTY DOLLARS ($22,680.00) <br />FOR AN ENGINEERING STUDY BY FLORIDA POWER AND LIGHT FOR THE <br />UNDERGROUNDING OF THE ELECTRICAL DISTRIBUTION LINES FOR <br />PROJECT 8 ATTACHED HERETO AS EXHIBIT 'A'; PROVIDING THE CITY <br />MANAGER WITH THE AUTHORITY TO DO ALL THINGS NECESSARY TO <br />EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. <br /> <br />WHEREAS, the City of Sunny Isles Beach wishes to convert the entire distribution <br />overhead electrical lines to underground in the City; and <br /> <br />WHEREAS, the City of Sunny Isles Beach has negotiated with Florida Power and Light <br />to provide an engineering study for the under grounding ofthe electrical lines; and <br /> <br />WHEREAS, Florida Power and Light has submitted a proposal for Project 8 of the <br />Distribution Overhead to Underground Conversion Project, which is attached hereto as Exhibit <br />"A". <br /> <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE <br />CITY OF SUNNY ISLES BEACH, FLORIDA, THAT: <br /> <br />Section 1. Approval of Expenditures. The City Manager is hereby authorized to expend <br />Twenty- Two Thousand Six Hundred Eighty Dollars ($22,680.00) for an engineering study for <br />Project 8 of the Distribution Overhead to Underground Conversions Project, attached as Exhibit <br />"A". <br /> <br />Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all <br />things necessary to effectuate this Resolution. <br /> <br />Section 3. <br /> <br />Effective Date. This Resolution will become effective upon adoption. <br /> <br />PASSED AND ADOPTED this \ ~'t+\ day of NO"e.t1\~, 2004. <br /> <br />". ~ r \ . r'~ f ,.., . <br />ATTEST: ,.. ',).,. J. I:' ;.2^. <br />! ..r ". '..;' ") " <br />~; \',1.,' ~. i <br />~. ." '.~~~ .~- ("\ \'?\ <br />..~A.,~:~ <br />r i'~J(.) fti~fi i:C~f1Glerk:" <br />i,f, :~>E~~~j?/}r~~.~~~~~:' · <br /> <br />,.-.;'1 <br /> <br /> <br /> <br />"'~~~::".. <br /> <br />.... (. <br /> <br />\, > <br /> <br />0' .;} r"' _~-.. <br /> <br />R2004- FPL Undergrounding' ' . ' <br />10/18/04 <br /> <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.