My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2004-737
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2004
>
Reso 2004-737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 4:31:19 PM
Creation date
1/25/2006 1:57:46 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2004-737
Date (mm/dd/yyyy)
11/18/2004
Description
– Undergrounding Engineering Study by FPL: $22,680.00.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.-- <br /> <br />) <br /> <br />J <br /> <br />. <br />F=PL <br /> <br />EXHIBIT A <br /> <br />Florida Power & Light Company <br /> <br />September 25, 2003 <br /> <br />Calvin, Giordano & Associates, Inc. <br />J. Scott Gombar, P.E. <br />1800 Eller Drive <br />Fort Lauderdale, FL 33316 <br /> <br />Re: 172"d Street from Collins Avenue west to North Bay Road. <br /> <br />Dear Mr. Gombar: <br /> <br />The non-binding ~ballparK" estimate to convert the overhead electric distribution facilities located at the above mentioned <br />address in Sunnv Isle Beach. Florida, to an underground system is $435.000.00. This estimate is not an offer from FPL to <br />perform the requested conversion and should not be construed or used as such for detailed planning purposes. ,It is provided <br />strictly to assist your preliminary decision making. <br /> <br />This non-binding estimate is an "order of magnitude" estimate, and is based on previous FPL experience. However, due to <br />the complex nature and variables associated with this type of worK, the estimate may not accurately represent the actual cost <br />your community would be obligated to pay FPL to convert its facilities. A detailed and "binding" estimate will be provided, <br />should you decide based on this "ballparK" estimate, and will commence should you elect to pay the non-refundable <br />engineering deposit as setforth in Florida Administrative Code 25-6.115. The deposit is required due to the complexity and <br />time required to estimate such a conversion, and would be applied towards the estimated amount (known also as the CIAC <br />amount) owed to FPL for the conversion, should you decide to proceed with the worK contained in the estimate, and contract <br />for that work within 180 days of the date the estimate is provided. <br /> <br />FPL estimates include only estimated charges to be paid by the applicant to FPL. Costs associated with restoration of <br />property affected by the conversion; acquisition and recording of easements; "clearing" of trench routes; trenching, <br />backfilling, and conduit installation of individual service laterals; and rearrangement of customer service entrances have been <br />excluded. These elements of the conversion will be the responsibility of the applicant. Rearrangement of customer electric <br />service entrances may, in addition, impose additional customer expense if local inspecting authorities require customer <br />wiring to be brought to current codes. The applicant is also responsible for arrangements that must be made to <br />accommodate other utilities/pole licensees affected by the conversion. <br /> <br />Regarding easements, an underground electric distribution system cannot just simply replace an overhead system. <br />Typically, overhead systems exist as part of a county or municipal right-of-way, and when necessary, as part of a specific <br />easement. In contrast, an underground distribution system requires more space than is typically provided by road rights-of- <br />way and easements for overhead facilities. In underground systems, major components formerly attached to poles must now <br />occupy "at grade" appurtenances, e.g., ground level pad mounted transformers and switch cabinets. Facilities of an <br />underground distribution system will not be placed in road right-of-way, with the exception of cables required for crossings. <br />Additional easements will, in all likelihood, be required. Describing, securing, and recording easements, with opinions of title, <br />is the responsibility of the applicant. <br /> <br />Should you decide to request a detailed "binding" estimate, an engineering deposit in the amount of $22.680.00 would be <br />required before commencing with the detailed design and estimating process. The request for the estimate must be in <br />writing, and must describe in detail the facilities to be converted. Binding estimates are valid for 180 days, and would be <br />subject to change in the event of a worK scope change. Should actual FPL costs exceed the binding estimate amount, the <br />applicant may be responsible for those additional costs up to a maximum of 10% of the binding estimate amount. Payment <br />of the CIAC, easements (with opinion of title and recorded), agreements from other utilities/pole licensees, and execution of a <br />Conversion Agreement would be required before commencement of construction. <br /> <br />Should you have any questions or wish to consider a binding cost estimate, please call me at (305)770-7934. <br /> <br />Sincerely, <br /> <br />Ellis Clenton <br />Customer Project Manager <br /> <br />Exhibit "A" <br /> <br />an FPL Group Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.