Laserfiche WebLink
<br />fl <br /> <br />L.J <br /> <br />" <br /> <br />SECTION 02484 <br /> <br />L.J <br /> <br />n <br /> <br />SOIL PREP ARA TION AND SOIL MIXES <br /> <br />LJ PART 1- GENERAL <br /> <br />" <br /> <br />1.01 <br /> <br />SCOPE OF WORK <br /> <br />u <br /> <br />A. <br /> <br />Provide all labor, materials, necessary equipment and services to complete the soil <br />preparation and soil mixes work, as indicated on the drawings, as specified herein or <br />both, except as for items specifically indicated as "NIC ITEMS". <br /> <br />" <br /> <br />LJ <br /> <br />rr <br /> <br />B. Including, but not limited to: <br /> <br />u <br /> <br />1. <br /> <br />Topsoil <br /> <br />n <br /> <br />2. <br /> <br />Soil Conditioners <br /> <br />LJ <br /> <br />3. <br /> <br />Planting Soil Mixes <br /> <br />n <br /> <br />1.02 RELATED WORK <br /> <br />u <br /> <br />A. Section 02210 - Fine Grading <br /> <br />n <br /> <br />LJ <br /> <br />B. <br /> <br />Section 02481 - Shrub and Tree Relocation <br /> <br />n <br /> <br />c. <br /> <br />Section 02487 - Sodding <br /> <br />u <br /> <br />D. <br /> <br />Section 02490 - Trees, Plants, and Groundcover <br /> <br />l' <br /> <br />1.03 QUALITY ASSURANCE <br /> <br />LJ <br /> <br />A. Testing Agency: Independent testing laboratory <br /> <br />" <br /> <br />u <br /> <br />B. <br /> <br />Requirements or Regulatory Agencies: Conform to requirements of all City, County and <br />State agencies. <br /> <br />" <br /> <br />C. Reference standards. <br /> <br />LJ <br /> <br />1.04 SUBMITTALS: <br /> <br />" <br /> <br />LJ <br /> <br />A. <br /> <br />Test Reports: Test reports shall consist of pH range, major and minor element analysis, <br />soluble salt concentrations, and recommendations. Reports shall be identified by project <br />name, date, and soil mix type. <br /> <br />n <br /> <br />L-J <br /> <br />1. <br /> <br />Results of topsoil (on-site existing soil) analysis. <br /> <br />" <br /> <br />2. <br /> <br />Results of planting soil mix( es) analysis: One test required per each type of soil <br />mix (note: pH ranges for plant type). <br /> <br />u <br /> <br />" <br /> <br />B. <br /> <br />Certificates: <br /> <br />u <br /> <br />1. <br /> <br />The Contractor must submit certificates from suppliers stating that the topsoil <br />mix, sod and other landscape material used comply with requirements specified. <br /> <br />" <br /> <br />LJ <br /> <br />" <br /> <br />06/05 <br /> <br />02484-1 <br /> <br />03-4138.8 <br /> <br />L.J <br />