My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />L.! <br /> <br />LJ <br /> <br />n 3.12 INSTALLATION SCHEDULE <br /> <br />" <br /> <br />A. <br /> <br />Concrete for aH structures shall have minimum compressive strength at 28 days of 3000 psi <br />unless otherwise indicated on the drawings. <br /> <br />LJ 3.13 FIELD CONTROL <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />L.! <br /> <br />n <br /> <br />LJ <br /> <br />C. <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />L.! <br /> <br />n <br /> <br />L.! <br /> <br />n <br /> <br />L) <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />II <br /> <br />L..J <br /> <br />" <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />06/05 <br /> <br />n <br /> <br />u <br /> <br />A. <br /> <br />The Contractor shall advise the Engineer of his readiness to proceed at least one working <br />day prior to each concrete placement. The Engineer will inspect the preparations for <br />concreting including the preparation of previously placed concrete, the reinforcing and the <br />alignment and tightness of formwork. No placement shall be made without the prior <br />approval of the Engineer. <br /> <br />B. <br /> <br />The Engineer may have cores taken from any questionable area in the concrete work such <br />as construction joints and other locations as required for determination of concrete quality. <br />The results {)f tests on such cores shall be the basis for acceptance, rejection or determining <br />the continuation of concrete work. <br /> <br />The Contractor shall cooperate in obtaining cores by allowing free access to the work and <br />permitting the use of ladders, scaffolding and such incidental equipment as may be <br />required. The Contractor shall repair all core holes to the satisfaction of the Engineer. The <br />work of cutting and testing the cores will be at the expense of the Owner if cores test <br />satisfactorily and will be at the expense of the Contractor if cores test unsatisfactorily. <br /> <br />END OF SECTION <br /> <br />03300-13 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.