My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />11 <br /> <br />u <br /> <br />(I <br /> <br />u <br /> <br />on the number of units completed) or, in the event there is no schedule of values, as provided in the <br />General Requirements. <br /> <br />II <br /> <br />u <br /> <br />5.1.1. Prior to Substantial Completion, progress payments will be made in an amount <br />equal to the percentage indicated below, but, in each case, less the aggregate of payments <br />previously made and less such amounts as ENGINEER shall determine, or OWNER may <br />withhold, in accordance with paragraph 14.02 of the General Conditions. <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />....2!L % of Work completed (with the balance being retainage). If Work has been <br />50% completed as determined by ENGINEER, and if the character and progress <br />of the Work have been satisfactory to OWNER and ENGINEER, OWNER, on <br />recommerdation of ENGINEER, may determine that as long as the character and <br />progress of the Work remain satisfactory to them, there will be no additional <br />retainage on account of Work completed, in which case the remaining progress <br />payments prior to Substantial Completion will be in an amount equal to 100% of <br />the Work completed. <br /> <br />u <br /> <br />n <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />~ % (with the balance being retainage) of materials and equipment not <br />incorporated in the Work (but delivered, suitably stored and accompanied by <br />documentation satisfactory to OWNER as provided in paragraph 14.02 of the <br />General Conditions and within Section 9-6.5 partial payments as provided in <br />FDOT Standard Specifications for Road and Bridge Construction. <br /> <br />n <br /> <br />u <br /> <br />l..J <br /> <br />LJ <br /> <br />5.1.2. When circumstances beyond the CONTRACTORS control arise (as determined by <br />the OWNER) the OWNER may allow the total payment to the CONTRACTOR to <br />increase to 98% of the contract price (with the balance being retainage), less such <br />amounts as ENGINEER shall determine, only after receipt of the final as-builts and upon <br />substantial completion of the project and in accordance with Paragraph 14.02 of the <br />General Conditions. <br /> <br />n <br /> <br />II <br /> <br />u <br /> <br />II <br /> <br />5.2. Final Payment Upon final completion and acceptance of the Work in accordance with <br />paragraph 14.07 of the General Conditions, OWNER shall pay the remainder of the Contract Price <br />as recommended by ENGINEER as provided in said paragraph 14.07. <br /> <br />u <br /> <br />CI <br /> <br />u <br /> <br />Article6. INTEREST. (Not Applicable) <br /> <br />!' <br /> <br />Article 7. CONTRACTOR'S REPRESENTATIONS. <br /> <br />LJ <br /> <br />In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following <br />representations: <br /> <br />II <br /> <br />LJ <br /> <br />7.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the <br />Addenda listed in paragraph 8) and the other related data identified in the Bidding Documents <br />including "technical data." <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />7.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the <br />general, local and site conditions that may affect cost, progress, performance or furnishing of the <br />Work. <br /> <br />u <br /> <br />II <br /> <br />u <br /> <br />n <br /> <br />06/05 <br /> <br />00500-3 <br /> <br />03-4138.8 <br /> <br />LJ <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.