Laserfiche WebLink
<br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />l---.J <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />fl <br /> <br />LJ <br /> <br />fl <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />fl <br /> <br />LJ <br /> <br />1. <br /> <br />SECTION 00100 <br /> <br />INSTRUCTIONS TO BIDDERS <br /> <br />DEFINITION OF TERMS <br /> <br />1.1 <br /> <br />1.2 <br /> <br />1.3 <br /> <br />2. <br /> <br />3. <br /> <br />06/05 <br /> <br />Bidding Documents - these include the Advertisement for Bid, Instructions to Bidders, <br />Bid Form, sample bidding and contract forms, proposed Contract Documents as defined <br />in the General Conditions and any Addenda issued prior to receipt of bids. <br /> <br />Total Base Bid - the amount stated on the Bid Form for which the Bidder offers to <br />perform the Work as described in the Bidding Documents. <br /> <br />Unit Price Bid - the amount stated in the Bid Form as a price per unit of measurement for <br />materials or labor as described in the Bidding Documents. <br /> <br />1.4 <br /> <br />Addenda - written and graphic documents issued by the Engineer prior to the execution <br />ofthe Contract to modify or interpret the Bidding Documents. <br /> <br />1.5 <br /> <br />General Conditions - 1996 Version of the Standard General Conditions of the <br />Construction Contract. <br /> <br />1.6 <br /> <br />Any Capitalized terms contained here-in (e.g. Owner, Engineer, Work, Agreement, <br />Contract) and is not defmed above are contained in the General Conditions Article 1 - <br />Definitions and Terminology. <br /> <br />BIDDING DOCUMENTS <br /> <br />2.1 <br /> <br />Complete sets of Bidding Documents may be obtained from the office of the Engineer as <br />stated in the Advertisement for Bid. <br /> <br />2.2 <br /> <br />Complete sets of Bidding Documents shall be used by Bidders in preparation of Bids; <br />neither the Owner nor the Engineer assume any responsibility for errors or <br />misinterpretations resulting from the use of incomplete sets. <br /> <br />2.3 <br /> <br />Bidding documents consist of this project manual along with the following construction <br />plans titled: <br /> <br />a. <br /> <br />City of Sunny Isles Beach Bid No.: 05-06-0 I <br />Median Fencing Improvements <br />CGA Project No.: 03-4138.B <br /> <br />EXAMINATION OF DOCUMENTS AND SITE <br /> <br />3.1 <br /> <br />Bidders shall visit the site of the proposed work and become familiar with the nature and <br />extent of work to be performed and local conditions that may affect the work. <br /> <br />3.2 <br /> <br />The Bidding Documents were prepared to present an essentially accurate representation <br />of existing conditions, interpreted from available information on the site. The Bidder is <br />not relieved, however, of the responsibility of becoming fully informed as to existing <br />conditions at the site. <br /> <br />00100-1 <br /> <br />03-4138.8 <br />