Laserfiche WebLink
<br />08/22/2005 08:45 <br /> <br />8535850510 <br /> <br />PAGE 05 <br /> <br />R&S Integrated - Standard Contract Document <br /> <br />Final Version <br /> <br />11. Termination For Cause <br /> <br />If, through any cause, R&S Integrated shall fail to fulfill in a timely and proper manner its obligations under <br />this Contract, or if R&S Integrated shall violate any of the provisions of this Contract, SDLC may, upon a <br />three (3) day written notice to R&S Integrated, immediately terminate the right of R&S Integrated to <br />proceed under this Contract or with such part or parts of the Contract as to which there has been default, <br />and may hold R&S Integrated liable for any damages caused to SDLC by reason of such default and <br />termination. In the event of such termination, any completed services performed by R&S Integrated under <br />this Contract shall, at the option of SOLC. become SDLC 's property and R&S Integrated shall be entitled <br />to receive equitable compensation in accordance with Attachment :3 for any work completed to the <br />satisfaction of SDLC, less any amounts which SOLC reasonably deems necessary to withhold in order to <br />correct any defects or deficiencies in the work performed by R&S Integrated. R&S Integrated, however, <br />shall not thereby be relieved of liability to SDLC for damages sustained by SOLe by reason of any breach <br />of the Contract by R&S Integrated, and SOLC may withhold any payments to R&S Integrated for the <br />purpose of set off until such time as the amount of damages can be determined, R&S Integrated shall not <br />be held liable tor damages under this article solely for reasons Df delay if the delay is due to causes <br />beyond its control and without its fault or negligence, but this shall not prevent SOLe from terminating this <br />Contract because of such delay. In no event shall SOLe pay for profit Dr Dverhead on work not <br />performed, <br /> <br />12 Proof-ot-Concept Definition <br /> <br />In order to demonstrate the Laserfiche EDRMS key features and system functionality within the SDLC <br />environment, while at the same time moving the EDRMS project forward with minimal additional effort or <br />delay, R&.S Integrated will implement Phase I of the project within Student Services (as defrned in Phase <br />One of the Implementation Plan and paragraph 5,2.1.1 in the GAP Analysis Report) for consideration as <br />the ProDf-ot-Concept pilot installation, All required Laserfiche EORMS and AnyDoe Software data <br />capture capabilities and functionality will be required for this Phase of the project, making it the ideal <br />candidate as the Proof-of-Concept vehicle <br /> <br />13 Termination During Proof-of-ConceDt <br /> <br />R&S Integrated will design and implement a pilot EDRMS installation (as defined in Paragraph 12 of this <br />contract) in order to demonstrate key features and system functionality in the SOLe environment. Based <br />on an evaluation of the EORMS during this pilot test. SOLe has the right to terminate this Contract and <br />shall provide R&S Integrated with written notice of such intent to terminate. SDLC shall pay R&S <br />Integrated for services performed prior to the termination date on a prorata basis per Attachments 3 and <br />4, <br /> <br />14. Termination For Convenience <br /> <br />This Contract may be terminated by SDLC without cause upon thirty (30) day written notice to R&S <br />Integrated. In the event of such a termination without cause, R&S Integrated shall be compensated for all <br />services, together with reimbursable expenses incurred in accordance with Attachments 3 and 4, In such <br />event, R&S Integrated shall promptly submit to SDLC its invoice for final payment and reimbursement <br />under the terms of this Contract. <br /> <br />R&S Intear::ltprl Prnr1IJrt" ..nrl ~"'!"\';"Q" In,.. <br /> <br />F"" <br />~ <br />r,. <br />