Laserfiche WebLink
<br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />ARTWORK/PROJECT: The sculpture entitled "Contained Energy" shall be composed of three <br />large cubic elements. Fabricated with fiberglass of various thickness, internally structured with a <br />treated steel mesh, a high density foam, gel-coat and finally, sprayed with "Carboline" a urethane <br />two component paint (Epoxycal) that includes an ultraviolet protection of its color (see model <br />sample of internal elements). The dimensions of this scul pture will be of approximately thilteen and <br />one half feet tall by eight feet wide by two feet deep (l3Yz' x 8'x 2'- see photo montage provided). <br /> <br />PURPOSE: ARTIST will design, fabricate and install an artwork/Project to commemorate the <br />CITY'S Art in Public Places projects. <br /> <br />LOCA TION OF FACILITY/SITE: Sunny Isles Beach Government Center located 18070 Collins <br />A venue. <br /> <br />ADMINISTRATIVE COORDINATION: The CONTRACT ADMINISTRATOR may designate a <br />public art project manager. The ARTIST shall maintain regular communication with the public art <br />project manager via phone, fax, letter or e-mail. <br /> <br />DESIGN COLLABORATION: During the design of the artwork, the ARTIST shall collaborate <br />and coordinate with the Contract Administrator and the CITY'S designated Architect/Engineer, <br />Construction Manager, and General Contractor, respectively, at the Facility/Site. The design of the <br />artwork shall be coordinated with the Facility/Site design process in the following areas: aesthetics, <br />public presentations, construction documents, cost estimates and Facility project schedules. Should <br />the design of the mtwork require specialized professional services, the ARTIST shall hire an <br />appropriate sub-consultant and/or sub-contractor subject to the prior written approval of the Contract <br />Administrator. Upon approval of the artwork design, the ARTIST shall create independently all <br />necessary construction documents for the mt and ancillary/suPPOlt facilities needed to install the art <br />as required by the CITY and/or applicable laws and codes; or provide all necessary information on a <br />timely basis in the event that relevant components of the art\.vork design must be incorporated into <br />the final construction documents for the Facility, if appropriate. <br /> <br />CONSTRUCTION AND INSTALLATION COORDINATION: During the installation of the <br />artwork, the ARTIST shall collaborate and coordinate with the Contract Administrator. The ARTIST <br />shall coordinate the installation of the artworks with the Facility construction schedule and install the <br />artwork in compliance with the Facility construction documents. The ARTIST shall be responsible <br />for construction oversight during the fabrication and integration of all ARTIST -designed <br />components, whether fabricated by ARTIST'S subcontractors or included in construction documents <br />to be fabricated and installed by others. <br /> <br />DELIVERABLES: the ARTIST shall provide the following deliverables: <br /> <br />I-A Research. <br /> <br />t", , ."'" <br />