My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-896
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:46 AM
Creation date
8/2/2006 4:00:36 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-896
Date (mm/dd/yyyy)
02/16/2006
Description
CALVIN GIORDANO - Consulting Services for Collins Avenue Median Closures
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Work Authorization No. 64 <br />January 5, 2006 <br />Calvin, Giordano & Associates, Inc. Proposal No. 05-5565 <br /> <br />CITY OF SUNNY ISLED BEACH <br />Collins Avenue (S.R. AlA) Median Closure <br /> <br />PROJECT DESCRIPTION: <br /> <br />1. SCOPE OF SERVICES <br /> <br />I. Professional Land Surveying Services <br /> <br />A. Design Survey <br /> <br />Locate existing medians, driveways, structures, sidewalks, signage, and any <br />other physical features within the right-of-way as specified by the engineer. <br />Prepare CADD base file with all information relevant to roadway engineering <br />design. <br /> <br />II. Professional Civil Engineering Services <br /> <br />A. Preliminary Investigation <br /> <br />Visit and inspect site to determine existing conditions. Take photos, make <br />written documentation, sketches, notes and research specific codes, regulations <br />and requirements. Collect all existing as-builts. Attend one (1) meeting with <br />the City to discuss the City's plans for the roadway layout. Coordinate with all <br />governmental agencies that have jurisdiction over the site. <br /> <br />B. Preliminary Design <br /> <br />Prepare a preliminary layout of the proposed roadway for presentation to the City. <br />Attend one (1) meeting to go over the City's comments. Revise the preliminary <br />plans per the City's comments. <br /> <br />C. Design Phase <br /> <br />Prepare proposed engineering design for the median closure while taking into <br />account location of existing driveways, sidewalks, right-of-way lines, trees, <br />structures and existing grades. <br /> <br />D. Final Civil Engineering Services <br /> <br />Prepare construction drawings and specifications including paving, grading and <br />drainage plans in accordance with all applicable codes. Secure all necessary <br />approvals for construction of project with Miami-Dade Public Works, FDOT, <br />Miami-Dade County Environmental Resource Management District, Miami- <br />Dade County Water and Sewer Department and the City of Sunny Isles Beach. <br />Perform all work incidentals to design of layout. Provide engineering drawings <br />at time of technical compliance. During bidding phases, any Requests for <br />Information (RFI' s) shall be responded to, bids shall be opened, tabulated and <br />recommendations shall be made. <br /> <br />P:\Proposals\2005 Proposals\05-5565 Sunny Isles Beach Collins Ave Median Closure.doc <br /> <br />S\B <br />
The URL can be used to link to this page
Your browser does not support the video tag.