Laserfiche WebLink
<br />Limerock Bearing Ratio Tests <br />Maximum Densitv Tests (AASHTO T-IEO) <br />01 / <br />Sieve Analysis <br />Organic Content Tests <br />Field Density Tests <br />Concrete Cylinder Tests (5 per set) <br />Shrinkage Tests (3/set) <br />Grout Prisms (4 per set) <br />Mortar Cubes <br />Block Prisms (3 per 10,000 units) <br />Engineering Services <br /> <br />2 @ $250.00 ea. <br />4 @ $100.00 ea. <br />3 @ $40.00 ea. <br />3 @ $40.00 ea. <br />80 @ $22.00 ea. <br />50 @ $60.00/set <br />4 @ $80.00/mix <br />15 @ $60.00/set <br />7 @ $60.00/set <br />5 @ $75.00 ea. <br />15 @ $80.00/hr <br /> <br />$500.00 <br />$400.00 <br />$120.00 <br />$120.00 <br />$1760.00 <br />$3000.00 <br />$320.00 <br />$900.00 <br />$420.00 <br />$375.00 <br />$1200.00 <br /> <br />SpecialfThreshold Inspections <br /> <br />OThe special inspection and threshold inspection will be performed for an estimated cost of J- <br />$18,500.00 based on the following quantities and unit rates. _ <br /> <br />Special/Threshold Inspections <br />Non-Destructive Testing of Welds <br />Engineering - Site Visits, Meetings, etc. <br /> <br />200hrs @ $55.00/hr <br />5 days @ $700.00/day <br />40 hrs @ $100.00/hr <br /> <br />$J t;JuO.OO <br />$3,500.00 <br />$4,000.00 <br /> <br />Based on our general understanding of the prnr;-~u~S":;u construction, we have estimated <br />approximate quantities and costs for r~'V1fs(Iuction materials testing and special/threshold <br />inspection services for thir.,-pnjJect as indicated below. <br /> <br />The above items and costs are estimated based on our general understanding of the project. The <br />final cost will be based on actual project scheduling and other issues beyond our control, and <br />could be more or less than indicated. You will be charged only for tests and inspections <br />performed. There will be no minimum charge per trip the site. There will be a one hour travel <br />charge per trip to the site for special and threshold inspection personnel. For time over 8 hours, <br />per day (Monday - Friday) Saturday and holidays the unit rates will be increased by 50%. Note <br />that Nutting Engineers of Florida, Inc. is not responsible for project site safety, which is the <br />responsibility of the general contractor. <br /> <br />Nutting has been offering engineering, testing and inspection services for 38 years in South <br />Florida, during which time we have worked on many well known projects including the <br />geotechnical exploration and pile monitoring for this project. Our commitment to practical, <br />cost-effective solutions supported by responsive client service, distinguishes the firm and enables <br />us to solve your most demanding technical challenges. One of the key constituents for Nutting's <br />success is our staff of eighty experienced professionals including engineering, geology, <br />environmental and field personnel that are registered/certified and have been trained to provide a <br />wide range of testing and inspection services and our administrative staff. <br /> <br />~NUTTING <br />Ie ENGI~~:,~,~c. <br /> <br />ESTABLISHED 1967 <br /> <br />3 <br /> <br />S/8 <br />