My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-953
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-953
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:50 AM
Creation date
8/15/2006 10:58:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-953
Date (mm/dd/yyyy)
07/20/2006
Description
APPLY/ACCEPT MPO GRANT ($2 Million) - Construct Pedestrian Bridge/Greenway
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXECUTIVE SUMMARY <br /> <br />Resolution Pending <br />Pedestrian and Emergency Vehicle Bridge <br />CGA Proj.# Pending <br />Fund # 4.7 <br /> <br />The city is planning to construct a pedestrian and emergency vehicle bridge <br />corinecting Nor1h Bay Road from l72nd Street to l74th Street. This bridge will <br />minimize the use of Collins Avenue by providing a safer path for pedestrians <br />wanting to visit the Town Center Park or its shops, as well as the children who <br />will be attending the future school on North Bay Road. Emergency vehicles <br />response time can be reduced by using this bridge. This connection is part of the <br />Transpor1ation Element of the city's Comprehensive Master Plan, to allow better <br />connectivity for the residents and alleviate traffic congestion along Collins <br />A venue. The city has applied to the Miami-Dade County MPO for a grant to <br />match the city's costs. <br /> <br />Estimated Design Cost $100,000.00 <br />Estimated Design/Permitting/Construction Admin/Mitigation Cost $175,000.00 <br />Estimated Construction Cost $4,000,000.00 <br />Grand Total $4,275,000.00 <br /> <br />CUlTent Status <br />Progress will commence when the grant becomes available. <br /> <br /> <br />Calvin, Giordano g Associates, Inc. <br />Engineers . Surveyors . Planners <br /> <br />April 2006 <br />CGA Project No. Pending <br />
The URL can be used to link to this page
Your browser does not support the video tag.