Laserfiche WebLink
<br />EXECUTIVE SUMMARY <br /> <br />Resolution Pending <br />Pedestrian and Emergency Vehicle Bridge <br />CGA Proj.# Pending <br />Fund # 4.7 <br /> <br />The city is planning to construct a pedestrian and emergency vehicle bridge <br />corinecting Nor1h Bay Road from l72nd Street to l74th Street. This bridge will <br />minimize the use of Collins Avenue by providing a safer path for pedestrians <br />wanting to visit the Town Center Park or its shops, as well as the children who <br />will be attending the future school on North Bay Road. Emergency vehicles <br />response time can be reduced by using this bridge. This connection is part of the <br />Transpor1ation Element of the city's Comprehensive Master Plan, to allow better <br />connectivity for the residents and alleviate traffic congestion along Collins <br />A venue. The city has applied to the Miami-Dade County MPO for a grant to <br />match the city's costs. <br /> <br />Estimated Design Cost $100,000.00 <br />Estimated Design/Permitting/Construction Admin/Mitigation Cost $175,000.00 <br />Estimated Construction Cost $4,000,000.00 <br />Grand Total $4,275,000.00 <br /> <br />CUlTent Status <br />Progress will commence when the grant becomes available. <br /> <br /> <br />Calvin, Giordano g Associates, Inc. <br />Engineers . Surveyors . Planners <br /> <br />April 2006 <br />CGA Project No. Pending <br />