Laserfiche WebLink
<br />City of SUIIIIY Isles Beach - <br /> <br />18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br /> <br />the Project, although ARTIST shall not be required to pay fees charged by the CITY for such <br />approvals and permits. <br /> <br />2.8 The ARTIST shall not make any public information release in connection with the Project <br />and/or the Work performed pursuant to this Agreement without the prior written permission <br />of the Contract Administrator. <br /> <br />2.9 The ARTIST shall take all necessary steps to coordinate the Work with any ongoing work of <br />the CITY, or any third party under the direction and control of the CITY, on or near the Site. <br /> <br />2.10 While ARTIST is solely responsible for the execution, fabrication, transportation, inspection <br />and/or installation of the Project, the following provisions shall apply: <br /> <br />a. The Contract Administrator shall notify ARTIST of the CITY'S, or any other <br />contractor's under the direction and c:mtrol of the CITY, construction schedules in and <br />around the area where the Work is to be performed or installed, if they are known by <br />the CITY. The ARTIST shall perform the Work in a manner and time so as not to <br />cause interference with any of the operations of the CITY or such third party <br />contractor. In the event of contlict between the schedules of a third party contractor, <br />CITY, and ARTIST, the contlict will be resolved by the Contract Administrator, and <br />the Contract Administrator's decision and resolution as to same shall be binding upon <br />ARTIST. <br /> <br />b. CITY may provide engineering expertise for the stone bolder upon which the sculpture <br />will be installed. However. ARTIST shall be solely responsible for conducting any <br />and all inspections of the Site for purposes of ascertaining the condition of same and <br />for the proper execution of the Work, and completion and installation of the Project. <br />ARTIST agrees to install a concrete pier post foundation that will appear as on the <br />ground with plantings surrounding it. <br /> <br />c. When working on the Site. ARTIST shall perform such periodic clean up as may be <br />reasonably requested by the Contract Administrator. Upon completion, ARTIST shall <br />remove his equipment, excess materials, and waste promptly from the Site, as directed <br />by Contract Administrator. <br /> <br />2.11 ARTIST shall bear all transportation and storage costs resulting from the construction, <br />delivery and installation of the Project. <br /> <br />4 <br /> <br />C0607 -044 Buttertly Artist Agreement <br /> <br />;,") <br />". r f'J <br />l..I I . <br /><.Il <br />