My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1099
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:09 AM
Creation date
6/20/2007 1:37:29 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1099
Date (mm/dd/yyyy)
05/17/2007
Description
Agmt w/ IBM: RFP Requirements Prep for Construction of Wireless Island
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Appendix C. Project Change Control Procedure <br /> <br />When both of us agree to a change in this Statement of Work, a written description of the agreed <br />change (called a "Change Authorization") will be prepared, which both parties must sign. The <br />Change Authorization will describe the change, the rationale for the change, and specify any <br />change in the charges, estimated schedule, or other terms. Depending on the extent and <br />complexity of the requested changes, IBM may charge for the effort required to analyze it. When <br />charges are necessary in order to analyze a change, IBM will provide a written estimate and begin <br />the analysis on written authorization. The terms of a mutually agreed upon Change Authorization <br />will prevail over those of this Statement of Work or any previous Change Authorization. <br /> <br />Page 12 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.