My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />105 -5.5.2 Earthwork Level II: Ensure the inspector responsible for <br />determining the disposition of soil and earthwork materials on the roadway, and for <br />interpreting and meeting Contract Document requirements holds a CTQP Earthwork <br />Construction Inspection Level II qualification. <br />105 -5.6 Asphalt QC Technicians: <br />105 -5.6.1 Plant Technicians: For asphalt plant operations, provide a QC <br />technician, qualified as a CTQP Asphalt Plant Level II technician, available at the asphalt <br />plant at all times when producing mix for the Department. Perform all asphalt plant related <br />testing with a CTQP Asphalt Plant Level I technician. <br />105 -5.6.2 Paving Technicians: For paving operations, keep a qualified CTQP <br />Asphalt Paving Level II technician on the roadway at all times when placing asphalt mix for <br />the Department, and perform all testing with a CTQP Asphalt Paving Level I technician. As <br />an exception, measurements of cross - slope, temperature and yield (spread rate) can be <br />performed by someone under the supervision of a CTQP Paving Level II technician. <br />105 -5.6.3 Mix Designer: Ensure all mix designs are developed by individuals <br />who are CTQP qualified as an Asphalt Hot Mix Designer. <br />105 -5.6.4 Documentation: Document all QC procedures, inspection, and all <br />test results and make them available for review by the Engineer throughout the life of the <br />Contract. <br />105 -5.7 Concrete QC Technicians: <br />105 -5.7.1 Concrete Field Technician - Level I: Ensure technicians performing <br />plastic property testing on concrete for materials acceptance are qualified CTQP Concrete <br />Field Technicians Level I. Plastic property testing will include but not be limited to slump, <br />temperature, air content, water -to- cementitious materials ratio calculation, and making and <br />curing concrete cylinders. Duties will include initial sampling and testing to confirm <br />specification compliance prior to beginning concrete placements, ensuring timely placement <br />of initial cure and providing for the transport of compressive strength samples to the <br />designated laboratories. Technicians who test concrete properties or perform Verification <br />testing for the Department must posses this qualification. <br />105 -5.7.2 Concrete Field Technician - Level II: Ensure field technicians <br />responsible for the quality of concrete being placed on major bridge projects are qualified <br />CTQP Concrete Field Technicians Level II. A Level II Technician must be present on the <br />jobsite during all concrete placements. Prior to the placement of concrete, the technician <br />will inspect the element to be cast to ensure compliance with Contract Documents. A <br />Level II Technician's duties may include ensuring that concrete testing, inspection, and <br />curing in the field is performed in accordance with applicable Contract Documents. The QC <br />Technician will inform the Verification Technician of anticipated concrete placements and <br />LOT sizes. <br />105 -5.7.3 Concrete Laboratory Technician - Level I: Ensure technicians <br />testing cylinders and recording concrete strength for material acceptance are qualified <br />CTQP Concrete Laboratory Technicians Level I. Duties include final curing, compressive <br />strength testing, and the recording /reporting of all test data. <br />105 -5.7.4 Concrete Production Facility Manager of Quality Control: Ensure <br />each concrete production facility has a Facility Manager for QC with the following <br />qualifications: <br />1. CTQP Concrete Laboratory Technician Level I, Concrete Field <br />Technician -Level I, and Batch Plant Operator. As alternatives to these qualifications, the <br />Department will accept: <br />March 2007 01000 -23 03- 4122.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.