My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HI <br />Specified Bearing Value <br />Unsoaked Bearing Value Required <br />ITolerance <br />LBR 40 <br />LBR 43 <br />JO. 0 <br />H <br />HJ' <br />a, <br />160 -7.2.2 Mixing Depth Requirements: Do not exceed individual depth <br />tolerance of 2 inches [50 mm] or LOT- average depth tolerance of 1 inch [25 mm]. <br />As an exception to the above mixing requirements, where the <br />subgrade is of rock, the Engineer may waive the mixing operations (and the work of <br />stabilizing), and the Department will not pay for stabilization for such sections of the <br />roadway. <br />160 -7.2.3 Density Requirements: <br />160 - 7.2.3.1 General: Within the entire limits of the width and depth <br />of the areas to be stabilized, other than as provided in 160- 7.2.3.2, obtain a minimum <br />density at any location of 98% of the Modified Proctor maximum density as determined by <br />FM 1 -T 180, Method D. <br />160 - 7.2.3.2 Exceptions to Density Requirements: The Contractor <br />need not obtain the minimum density specified in 160-7.2.3.1 if within the following limits: <br />(a) The width and depth of areas which are to be subsequently <br />incorporated into a base course under the same contract. <br />(b) The upper 6 inches [150 mm] of areas to be grassed under <br />the same contract. Compact these areas to a reasonably firm condition as directed by the <br />Engineer. <br />160 -7.2.4 Frequency: Conduct QC sampling and testing at a minimum <br />frequency listed in the table below. The Engineer will perform Verification sampling and <br />tests at a minimum frequency listed in the table below. <br />Test Name <br />Quality Control <br />Verification <br />Modified Proctor MaximumOne <br />Density <br />per two consecutiveOne <br />LOTs <br />per eight consecutive <br />LOTs <br />Density <br />One per LOT <br />One per four LOTs <br />Limerock Bearing Ratio <br />One per two consecutiveOne <br />LOTs <br />per eight consecutive <br />LOTs <br />Stabilizing Mixing Depth <br />Three per LOT <br />One per LOT <br />160 -7.3 Additional Requirements: <br />160 -7.3.1 Quality Control Testing: <br />160 - 7.3.1.1 Bearing Values: Ensure compliance with 160 -7.2.1 by <br />sampling and testing the Stabilized Subgrade for determining the Limerock Bearing Ratio <br />(LBR) in accordance with FM 5 -515 and 160 - 7.2.4. Determine test locations including <br />Stations and Offsets, using the Random Number generator provided by the Department, <br />based on the two LOTs under consideration. <br />160 - 7.3.1.2 Mixing Depth Requirements: Meet required plan mixing - <br />depths by measuring from the proposed Final Grade Line. Ensure compliance with <br />160 - 7.2.2. Determine test locations including Stations and Offsets, using the Random <br />Number generator provided by the Department. Record results on forms supplied by the <br />_ Department. <br />160 - 7.3.1.3 Modified Proctor Maximum Density Requirement: Collect <br />enough material to split and create three separate samples. Retain a Verification sample <br />March 2007 01000 -38 03- 4122.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.