My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i71. <br />I <br />IIP <br />TABLE 6 <br />Property <br />Target Range <br />Tolerance <br />Slump (Non - Drilled Shaft Concrete without <br />± 1 .5 inch [ ±40 <br />+ 0.75 inch [ ±20 mm] <br />— <br />HRWR) <br />mm] <br />Slump (Non - Drilled Shaft Concrete with <br />± 1.5 inch [ ±40 <br />+ 1 .0 inch [ ±25 mm] <br />— <br />HRWR) <br />mm] <br />Slump (Drilled Shaft Concrete) <br />± 1.0 inch [±25 mm] <br />± 1.0 inch [ ±25 <br />mm] <br />Air Content JAs <br />shown in the range in Table 2 <br />Reject concrete with slump or air content exceeding the above tolerances. <br />Do not allow concrete to remain in a transporting vehicle to reduce slump. Water may be <br />added only upon arrival of the concrete to the job site and not thereafter. <br />If the slump of non - drilled shaft concrete varies from the target value in <br />excess of 0.75 inch [20 mm] (1 inch [25 mm] for concrete containing HRWR), immediately <br />adjust the concrete mixture to correct the slump of succeeding batches. The Engineer will <br />allow a reasonable time for adjustment, taking into consideration trucks already in route <br />from the concrete production facility. If the Contractor does not implement adjustments at <br />the earliest possible time, the Engineer will reject the concrete and terminate further <br />production until the Contractor makes corrections. <br />346 -7 Mixing and Delivering Concrete. <br />346 -7.1 General Requirements: Operate all concrete mixers at speeds and volumes <br />per the manufacturer's design or recommendation as stipulated on the mixer rating plate. <br />346 -7.2 Transit Mixing: When water is added at the job site, mix the concrete 30 <br />additional mixing revolutions. When mixing for the purpose of adjusting consistency, do <br />not allow the total number of revolutions at mixing speed to exceed 160. Discharge all <br />concrete from truck mixers before total drum revolutions exceed 300. <br />346 -7.3 Mixing at the Site: Use a mixer of sufficient capacity to prevent delays that <br />may be detrimental to the quality of the work. Ensure that the accuracy of batching <br />equipment is in accordance with requirements of this Section. <br />346 -7.4 Concreting in Cold Weather: Do not mix concrete when the air temperature <br />is below 45 °F [7 °C] and falling. The Contractor may mix and place concrete when the air <br />temperature in the shade, and away from artificial heat, is 407 [4 °C] and rising. Protect <br />the fresh concrete from freezing until the concrete reaches a minimum compressive <br />strength of 1,500 psi [10 MPa] unless the concrete is to be heat cured. <br />346 -7.5 Concreting in Hot Weather: Hot weather concreting is defined as the <br />production, placing and curing of concrete when the concrete temperature at placing <br />exceeds 85 °F [30 °C] but is less than 100 °F [40 °C]. <br />Unless the specified hot weather concreting measures are in effect reject <br />concrete exceeding 857 [30 °C] at the time of placement. Regardless of special measures <br />taken, reject concrete exceeding 100 °F [40 °C]. Predict the concrete temperatures at <br />placement time and implement hot weather measures to avoid production shutdown. <br />346 -7.6 Transit Time: Ensure compliance with the following maximum allowable <br />time between the initial introduction of water into the mix and depositing the concrete in <br />place: <br />March 2007 01000 -100 03- 4122.D rt <br />
The URL can be used to link to this page
Your browser does not support the video tag.