My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be randomly confirmed by the Department. If there is no verification data for a LOT, <br />then the LOT goes to Resolution Investigation to determine conformance with 346 -9. <br />TABLE 9 <br />Class Concrete <br />Maximum LOT Size <br />one lane mile [1.5 lane km] or one day's <br />I (Pavement) <br />production, whichever is less <br />150 yd 3. [125 m3] or one day's production, <br />I (Special) <br />whichever is less <br />ll, II (Bridge Deck), III, IV, IV (Drilled Shaft), V50 <br />yd' [40 m3], or one day's production, <br />(Special), V, VI <br />whichever is less <br />III (Seal) <br />Each Seal placement <br />346 -9.2.1 Reduced Frequency for Acceptance Tests: For all structural <br />concrete except Class I and III (Seal), if the previous 15 consecutive strength test results <br />of the same design mix produced at the same concrete production facility, on a given <br />Contract have all been verified and have attained an average strength greater than two <br />standard deviations above the specified minimum, then the maximum LOT size will be <br />increased to 100 yd' [80 m3]. <br />The average of 15 consecutive breaks can be established based on historical <br />data from the previous project. The data must also represent the same prime /sub <br />contractor. The last test from the previous fob must be within the last 60 calendar days. <br />Test data must be from a laboratory meeting the requirements of 6 -9. <br />'j The average of 15 consecutive compressive strength test results can also be <br />established by a succession of samples on the current project. Only one sample can be <br />taken from each LOT. <br />I If at any time a strength test is not verified and /or the average strength of <br />the previous 15 consecutive samples is less than the specified minimum plus two standard <br />deviations, the maximum LOT size will return to 50 yd3 [40 m3]. The maximum LOT size <br />will remain 50 yd [40 m3] until the thresholds listed above are achieved. <br />346 -9.3 Strength Test Definition: The strength test of a LOT is defined as the <br />average of the compressive strengths tests of three cylinders cast from the same sample <br />of concrete from the LOT. <br />346 -9.4 Acceptance of Hardened Concrete: Hardened concrete will be accepted or <br />rejected on the basis of strength test results as defined in 346 -9.3. Do not discard a <br />cylinder strength test result based on low strength (strength below the specified minimum <br />strength as per the provisions of 346 -3 and 346 -9). When QC strength test results are <br />verified, the Engineer will accept the concrete based on QC test results. The Engineer will <br />accept at full pay only LOTs of concrete represented by strength test results which equal <br />or exceed the respective specified minimum strength. <br />When one of the three QC cylinders from a LOT is lost, damaged or <br />destroyed, determination of compressive strength will be made by averaging the remaining <br />two cylinders. If more than one QC cylinder from a LOT is lost, damaged or destroyed, the <br />Contractor will core the structure at no additional expense to the Department to determine <br />the compressive strength. Acceptance of the LOT may be based on verification data at the <br />discretion of the Engineer. Obtain the approval of the Engineer to core, and of the core <br />location prior to drilling. <br />March 2007 01000 -104 03- 4122.D <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.