My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />I <br />E <br />E <br />I <br />N <br />I <br />I <br />u. <br />III, <br />6!1 <br />H <br />Class 5 finish may be applied to attain a uniform appearance for the entire structure, to the <br />satisfaction of the Engineer. <br />548 -5 Handling Storage and Shipping. <br />Handle, store and ship all components in a manner that prevents chipping, cracks, <br />fractures, excessive bending stresses, mud, dirt and debris. Support precast components in <br />storage on firm blocking located immediately adjacent to the attachment device. <br />548 -6 Construction Requirements. <br />548 -6.1 General: Due to the unique nature of the structure and concept, procure <br />from the Wall Supplier fully detailed shop drawings, technical instructions, guidance in <br />preconstruction activities and on -site technical assistance during construction. Closely <br />follow any instructions from the Wall Supplier, unless otherwise directed by the Engineer. <br />Submit a copy of any instructions from the Wall Supplier to the Engineer. Verify all <br />pertinent retaining wall information (soil parameters, wall alignment, utility locations, <br />conflicting structures) prior to the Wall Supplier finalizing shop drawings. Bring any <br />conflicts not shown in the Contract Documents to the Engineer's attention. <br />548 -6.2 Wall Excavation: Excavate to the limits shown in the Contract Documents <br />and in conformance with Section 125. <br />548 -6.3 Foundation Preparation: Grade the foundation for the structure level for a <br />width equal to or exceeding the limits of the retaining wall volume or as shown in the <br />Contract Documents. Prepare the foundation in conformance with Section 125. <br />In addition to the compaction requirements of Section 125, compact the <br />graded area with an appropriate vibratory roller weighing a minimum of 8 tons [7 metric <br />tons] for at least five passes or as directed by the Department's District Geotechnical <br />Engineer. Remove and replace any soft or loose foundation subsoils which, are incapable of <br />sustaining the required compaction to the Engineer's satisfaction. <br />For permanent MSE wall systems, provide an unreinforced concrete leveling <br />pad as shown in the Contract Documents. Cure the leveling pad a minimum of 12 hours <br />before placement of precast wall components. <br />548 -6.4 Wall Erection: Assemble, connect and support wall components as <br />recommended by the Wall Supplier. As backfill material is placed behind the wall face, <br />maintain the wall in the vertical position or slightly battered into the backfill to provide a <br />final vertical alignment (by means of bracing, temporary wooden wedges placed in the joint <br />at the junction of the two adjacent precast components on the external side of the wall or <br />other alignment aids). Remove wooden wedges as soon as the precast component above <br />the wedged precast component is completely erected and backfilled. External bracing is <br />required for the initial lift of MSE systems. <br />Place soil reinforcement normal to the face of the wall, unless otherwise <br />shown in the Contract Documents or directed by the Engineer. Prior to placement of the <br />reinforcement, compact the backfill in accordance with 548 -6.5. <br />548 -6.4.1 Tolerances for Permanent Walls: Ensure that vertical tolerances <br />(plumbness) and horizontal alignment tolerances do not exceed 3/4 inch [20 mm] when <br />measured with a 10 foot [3.048 m] straight edge. The maximum allowable offset in the <br />joint between precast components is 3/4 inch [20 mm]. The final overall vertical tolerance <br />of the completed wall (plumbness from top to bottom) shall not exceed 1/2 inch per <br />10 feet [5 mm per meter] of wall height. Horizontal and vertical joints between precast <br />components shall not be less than 1/2 inch [13 mm] or more than 1 1/4 inch [30 mm]. <br />March 2007 01000 -125 03- 4122.D <br />•.e,.. L .4J <br />
The URL can be used to link to this page
Your browser does not support the video tag.