Laserfiche WebLink
I <br />I <br />r <br />I <br />Apply the galvanizing compound to attain a uniform appearance free from all <br />defects or failures. Submit repair procedure(s) to the Engineer for approval. All deficiencies <br />will be corrected at no cost to the Department. <br />562 -4 Basis of Payment. <br />No direct payment will be made for galvanizing compound coating of welded <br />surfaces or for field repair of damaged galvanized surfaces. Include the cost to perform <br />these operations, in the Contract price for the item which includes the member being so <br />treated. <br />575 SODDING. <br />(REV 1 -5 -04) (FA 1 -8 -04) (7 -04) <br />SECTION 575 (Pages 668 -670) is deleted and the following substituted: <br />SECTION <br />SODDING <br />575 <br />575-1 Description. <br />Establish a stand of grass within the specified areas, by furnishing and placing sod, <br />and rolling, fertilizing, watering, and maintaining the sodded areas to ensure a healthy <br />stand of grass. <br />575 -2 Materials. <br />Meet the following requirements: <br />Sod......................................... ............................... 981 -2 <br />Fertilizer, Type I ........................ ........................Section 982 <br />Water...... ............................... ........................Section 983 <br />575 -3 Construction Methods. <br />575 -3.1 Preparation of Ground: Fertilize at the rate as shown in Section 570. <br />Scarify or loosen the areas requiring sod to a depth of 6 inches [1 50 mm]. On areas where <br />the soil is sufficiently loose, particularly on shoulders and fill slopes, the Engineer may <br />authorize the elimination of the ground preparation. Limit preparation to those areas that <br />can be sodded within 72 hours after preparation. Prior to sodding, thoroughly water areas <br />and allow water to percolate into the soil. Allow surface moisture to dry before sodding to <br />prevent a muddy soil condition. <br />575 -3.2 Placing Sod: Place sod immediately after ground preparation. Do not use <br />sod which has been cut for more than 72 hours. Stack all sod that is not planted within 24 <br />hours after cutting and maintain proper moist condition. <br />Do not sod when weather and soil conditions are unsuitable for proper <br />results. Pre -wet the area prior to placing sod. Do not place sod on eroded or washed out <br />sites. <br />Place the sod on the prepared surface, with edges in close contact, and <br />embed it firmly and smoothly by light tamping with appropriate tools. <br />March 2007 01000 -140 03- 4122.D ._.� <br />