Laserfiche WebLink
I <br />I <br />IIP. <br />L <br />SUBARTICLE 630 -4.2 (Page 690) is deleted and the following substituted: <br />630 -4.2 Furnish and Install: The Contract unit price per foot [meter] of <br />conduit, furnished and installed, will include furnishing all hardware and materials as <br />specified in the Contract Documents, and all labor, trenching, backfilling, and restoration <br />materials necessary for a complete and accepted installation. <br />Payment for conduit placed in the ground or used on bridge decks will <br />be based on the horizontal path of the installed conduit as measured in a straight line <br />between the centers of pull boxes, cabinets, poles, etc. No allowance will be made for <br />sweeps or vertical distances above or below the ground or the bridge deck. <br />Due to conditions which may exist on the project site, the Contractor <br />may furnish conduit in variable lengths. <br />Furnishing and installing the locate wire is included in the cost of the <br />conduit. <br />Conduit used for fiber optic cable includes the cost of furnishing and <br />j installing the locate wire and the cost of conducting the continuity test and the insulation <br />resistance test. <br />SUBARTICLE 630 -4.4 (Page 690) is deleted and the following substituted: <br />630 -4.4 Install: The Contract unit price per foot [meter] of conduit, installed, will <br />include all miscellaneous hardware and materials, labor, trenching, backfilling, and <br />restoration materials necessary for a complete and accepted installation. <br />The Engineer will supply conduit in sections with one coupling per section <br />and elbows as required. <br />Payment for conduit placed in the ground or used on bridge decks will be <br />based on the horizontal path of the installed conduit as measured in a straight line between <br />the centers of pull boxes, cabinets, poles, etc. No allowance will be made for sweeps or <br />vertical distances above or below the ground or the bridge deck. <br />Installing the locate wire is included in the cost of the conduit. Conduit used <br />for fiber optic cable includes the cost of installing the locate wire and the cost of <br />conducting the continuity test and the insulation resistance test. <br />641 PRESTRESSED CONCRETE POLES. <br />(REV 2- 24 -04) (FA 3- 22 -04) (1 -05) <br />SECTION 641 (Pages 702 -703) is deleted and the following substituted: <br />SECTION <br />PRESTRESSED CONCRETE POLES <br />641 <br />641 -1 Description. <br />Furnish and install prestressed concrete poles for service pole applications <br />(Type N -II), luminaire support (Type N -III), and strain poles for span wire support of traffic <br />signals, signs, and other devices (multiple types). Obtain precast, prestressed concrete <br />poles from a manufacturing plant that is currently on the Department's list of qualified <br />March 2007 01000 -147 03- 4122.D ri <br />