My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />IIP. <br />L <br />SUBARTICLE 630 -4.2 (Page 690) is deleted and the following substituted: <br />630 -4.2 Furnish and Install: The Contract unit price per foot [meter] of <br />conduit, furnished and installed, will include furnishing all hardware and materials as <br />specified in the Contract Documents, and all labor, trenching, backfilling, and restoration <br />materials necessary for a complete and accepted installation. <br />Payment for conduit placed in the ground or used on bridge decks will <br />be based on the horizontal path of the installed conduit as measured in a straight line <br />between the centers of pull boxes, cabinets, poles, etc. No allowance will be made for <br />sweeps or vertical distances above or below the ground or the bridge deck. <br />Due to conditions which may exist on the project site, the Contractor <br />may furnish conduit in variable lengths. <br />Furnishing and installing the locate wire is included in the cost of the <br />conduit. <br />Conduit used for fiber optic cable includes the cost of furnishing and <br />j installing the locate wire and the cost of conducting the continuity test and the insulation <br />resistance test. <br />SUBARTICLE 630 -4.4 (Page 690) is deleted and the following substituted: <br />630 -4.4 Install: The Contract unit price per foot [meter] of conduit, installed, will <br />include all miscellaneous hardware and materials, labor, trenching, backfilling, and <br />restoration materials necessary for a complete and accepted installation. <br />The Engineer will supply conduit in sections with one coupling per section <br />and elbows as required. <br />Payment for conduit placed in the ground or used on bridge decks will be <br />based on the horizontal path of the installed conduit as measured in a straight line between <br />the centers of pull boxes, cabinets, poles, etc. No allowance will be made for sweeps or <br />vertical distances above or below the ground or the bridge deck. <br />Installing the locate wire is included in the cost of the conduit. Conduit used <br />for fiber optic cable includes the cost of installing the locate wire and the cost of <br />conducting the continuity test and the insulation resistance test. <br />641 PRESTRESSED CONCRETE POLES. <br />(REV 2- 24 -04) (FA 3- 22 -04) (1 -05) <br />SECTION 641 (Pages 702 -703) is deleted and the following substituted: <br />SECTION <br />PRESTRESSED CONCRETE POLES <br />641 <br />641 -1 Description. <br />Furnish and install prestressed concrete poles for service pole applications <br />(Type N -II), luminaire support (Type N -III), and strain poles for span wire support of traffic <br />signals, signs, and other devices (multiple types). Obtain precast, prestressed concrete <br />poles from a manufacturing plant that is currently on the Department's list of qualified <br />March 2007 01000 -147 03- 4122.D ri <br />
The URL can be used to link to this page
Your browser does not support the video tag.