Laserfiche WebLink
I <br />I <br />I <br />I <br />e <br />r� <br />I! <br />I <br />III; <br />I <br />710 -10 Method of Measurement. <br />The quantities to be paid for under this Section will be as follows: <br />(a) The net length, in feet [meters], of each of the various types of lines and <br />stripes, authorized and acceptably applied. <br />(b) The total traversed distance in gross miles [kilometers] of 10 -30 skip line. <br />The actual applied line is 25% of the traverse distance for a 1:3 ratio. This equates to <br />1,320 feet [250 m] of marking per mile [kilometer] of single line. <br />(c) The length, in net miles [net kilometers], of Solid Traffic Stripe, <br />authorized and acceptably applied. <br />(d) The number of pavement messages, symbols and directional arrows, <br />authorized and acceptably applied. <br />(e) The length, in gross miles [kilometers], of Alternating Skip Traffic Stripe, <br />authorized and acceptable applied. <br />(f) Lump Sum, as specified in 710 -4.1 .1 when the item for Painted Pavement <br />Markings (Final Surface) is included in the proposal. <br />The net length, in feet [meters] of dotted and skip stripes other than 10 -30 [3m -9m] <br />will be measured as the distance from the beginning of the first painted stripe to the end of <br />the last painted stripe with proper deductions made for unpainted intervals as determined <br />by plan dimensions or stations, subject to 9 -1 .3. Unpainted intervals will not be included in <br />pay quantity. <br />The gross -mile [gross - kilometer] measurement of 10 -30 Skip Traffic Stripes will be <br />taken as the distance from the beginning of the first painted stripe to the end of the last <br />painted stripe, and will include the unpainted intervals. It will not include any lengths of <br />unpainted intervals which, by design or by other intent of the Department, are greater than <br />30 feet [9 m]. Final measurement will be determined by plan dimensions or stations, <br />subject to 9 -1 .3.1 . <br />710 -11 Basis of Payment. <br />710 -11.1 General: Prices and payments will be full compensation for all work <br />specified in this Section, including, all cleaning and preparing of surfaces, furnishing of all <br />materials, application, curing and protection of all items, protection of traffic, furnishing of <br />all tools, machines and equipment, and all incidentals necessary to complete the work. <br />Final payment will be withheld until all deficiencies are corrected. <br />710 -11.2 Lump Sum Payment: When the item for Painted Pavement Markings (Final <br />Surface) is included in the proposal, price and payment will be full compensation two <br />applications of all painted pavement markings applied to the final surface, and one <br />application of retro- reflective pavement markers applied to the final surface in accordance <br />with Section 706. <br />Payment will be made under: <br />Item No. 710- 6- Directional Arrow, Painted - each. <br />Item No. 2710- 6- Directional Arrow, Painted - each. <br />Item No. 710- 7- Pavement Messages, Painted - each. <br />Item No. 2710- 7- Pavement Messages, Painted - each. <br />Item No. 710- 21- Skip Traffic Stripe (White /Black) - per gross mile. <br />Item No. 2710- 21- Skip Traffic Stripe (White /Black) - per gross kilometer. <br />Item No. 710- 22- Skip Traffic Stripe (Yellow) - per gross mile. <br />Item No. 2710- 22- Skip Traffic Stripe (Yellow) - per gross kilometer. <br />Item No. 710- 23- Solid Traffic Stripe (White /Black) - per net mile. <br />March 2007 01000 -160 03- 4122.D <br />