My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />M <br />I <br />u, <br />H� <br />H11 <br />qt� <br />n <br />requires testing by FM 1 -T 283 and the test results indicate it is not required, or the <br />mixture contains hydrated lime. Where FM 1 -T 283 indicates an anti -strip additive is <br />required, it shall be from 0.25 to 0.75 %. The anti -strip additive shall meet the <br />requirements of 91 6 -5. The anti -strip additive shall be introduced into the PG binder by the <br />supplier during loading. <br />Where PG binder is used in mixes containing reclaimed asphalt pavement <br />(RAP), the requirements of 334 -2.3.4 must also be met. <br />916 -1.2 Qualified Products List: The Superpave PG asphalt binders supplied under <br />this Specification shall be one of the products included on the Qualified Products List as <br />specified in 6-1. Any marked variation from the original test values for a material below the <br />established limits or evidence of inadequate quality control or field performance of a <br />material will be considered to be sufficient evidence that the properties of the material <br />have changed, and the material will be removed from the Qualified Products List. <br />For each binder grade, the supplier may be required to submit to the State <br />Materials Office a split sample of material representative of test results submitted with the <br />Product Evaluation Application. In addition, for modified binders, the original PG binder <br />grade, the modifier product designation, and amount added shall be indicated. Suppliers <br />shall not ship any PG binder until notified that the product is on the Qualified Products List <br />and an approved Quality Control Program meeting the requirements of 916 -1.3 has been <br />implemented. <br />916 -1.3 Quality Control Program: The supplier of Superpave PG asphalt binder shall <br />at a minimum have a Quality Control Program meeting the requirements of this <br />Specification which is based on AASHTO R -26. The Quality Control Program shall be <br />submitted in electronic format to the State Materials Office for approval. <br />The requirements for the Quality Control program apply to the supply <br />location of PG binders for the use on Florida Department of Transportation projects. The <br />supply location of PG binder may represent refinery production, terminal distribution, <br />blending, processing and /or modification location. Rack blending (blending from two tank <br />sources) will be permitted to meet the requirements for a PG asphalt binder product. Any <br />special handling requirements such as rack blending and manufacture of polymer modified <br />asphalt shall be described in the Quality Control program. The requirements of these <br />Specifications for a Quality Control Program do not apply to Recycle Agents at this time. <br />916 -1.3.1 Identification of Personnel and Supply Locations: The supplier's <br />primary and secondary representatives responsible for Quality Control shall be identified by <br />name, title, address, telephone, fax and e -mail address. At least one of the representatives <br />shall be located at the supply location. The supply locations shall be identified by name, <br />address and telephone. <br />916 -1.3.2 Specification Compliance and Quality Control Testing: <br />Specification Compliance Testing shall consist of complete testing of each PG binder <br />shipped in accordance with AASHTO M -320 and 916 -1 .1 of these Specifications. Results <br />of Specification Compliance Testing shall be available to the supplier within five working <br />days of sampling. Specification Compliance Testing shall be conducted by a testing <br />laboratory that participates at least annually in the AMRL Reference Sample Testing <br />Program. The primary testing lab and any other labs to be used for Specification <br />Compliance Testing shall be identified in the suppliers Quality Control Program. The results <br />from each A(VIRL proficiency Sample for each testing laboratory shall be forwarded by the <br />supplier for each supply location in electronic format to the State Materials Office. <br />Acceptable performance in the AMRL proficiency Sample Testing Program shall be a <br />I March 2007 01000 -163 <br />03- 4122.D <br />T• <br />`yi <br />
The URL can be used to link to this page
Your browser does not support the video tag.