My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br />I <br />u <br />II <br />b <br />t <br />Oxidation Resistance of Pipes <br />Pipe Location Test Method Test Conditions Requirement <br />Liner and/or ASTM Test D. replicates (to determine <br />25 minutes, minimum <br />Crown 3895) initial OJT value) <br />Incubation Three samples for incubation <br />Liner and /o est FM 5 -574of 195 days at 80'C and (no Average valluu e shall be less tha <br />of 3 ± 1 minute <br />Crown and OJT testapplied stress of 250 psi. One2 minutes) <br />ASTM D 389501T test per each sample. <br />2 <br />Note: FM= Florida Method of Test. <br />• Required only when corrugation resin is different than liner resin. <br />• A higher test temperature (90 °C) may be used if supporting test data acceptable to th <br />State Materials Engineer is submitted and approved in writing. <br />948 -2.3.3 Certification: Furnish to the Engineer certification from the <br />manufacturer for each pipe diameter to be incorporated into the project that the pipe meets <br />the requirements of these Specifications. <br />Manufacturers seeking evaluation of a product in accordance with <br />Departmental procedures must submit test reports conducted by a laboratory deemed to be <br />appropriately qualified by the Plastics Pipe Institute and acceptable to the State Materials <br />Engineer. Submit this information to the Director, State Materials Office. <br />SUBARTICLE 948 -4.4 (Page 861) is expanded by the following: <br />948 -4.4.1 Machine Spiral Wound Pipe Liner: Machine spiral wound pipe liner <br />shall consist of a continuous one piece profile strip wound directly into the deteriorated <br />pipelines. The liner can be installed in close fit to the host pipe, or alternatively installed at <br />a fixed diameter. Where the liner is installed at a fixed diameter, the annular space <br />between the spiral wound liner pipe and the existing pipe is grouted. <br />(1) Polyvinyl Chloride: Polyvinyl chloride machine spiral wound pipe <br />liner shall meet the requirements of ASTM F 1697 and shall have a minimum cell <br />classification of 13354. <br />March 2007 01000 -183 03- 4122.D <br />Single Test: <br />Test temperature 80 °C and <br />applied stress of 650 psi.; 5calculated <br />replicates <br />The failure time must be <br />equal or greater than the <br />value using the <br />three constants from the <br />three points test <br />Test temperature 80 °C and <br />applied stresses of 650 andCalculate <br />three constants <br />450 psi. <br />Failure time at 500 psi at <br />FM 5 -572, <br />Test temperature 70 °C at23 <br />°C _> 100 years (95% <br />applied stress of 650 psi; 5statistical <br />applied <br />confidence) <br />Longitudinal <br />Procedure C, <br />Profile* <br />and FM 5 -573 <br />at each stress level <br />ASTM 2837 <br />The failure time must be <br />Single Test: Test temperatureequal <br />or greater than the <br />80 °C and applied stress of 650 <br />calculated value using the <br />psi.; 5 replicates <br />hree constants from the <br />hree points test <br />Oxidation Resistance of Pipes <br />Pipe Location Test Method Test Conditions Requirement <br />Liner and/or ASTM Test D. replicates (to determine <br />25 minutes, minimum <br />Crown 3895) initial OJT value) <br />Incubation Three samples for incubation <br />Liner and /o est FM 5 -574of 195 days at 80'C and (no Average valluu e shall be less tha <br />of 3 ± 1 minute <br />Crown and OJT testapplied stress of 250 psi. One2 minutes) <br />ASTM D 389501T test per each sample. <br />2 <br />Note: FM= Florida Method of Test. <br />• Required only when corrugation resin is different than liner resin. <br />• A higher test temperature (90 °C) may be used if supporting test data acceptable to th <br />State Materials Engineer is submitted and approved in writing. <br />948 -2.3.3 Certification: Furnish to the Engineer certification from the <br />manufacturer for each pipe diameter to be incorporated into the project that the pipe meets <br />the requirements of these Specifications. <br />Manufacturers seeking evaluation of a product in accordance with <br />Departmental procedures must submit test reports conducted by a laboratory deemed to be <br />appropriately qualified by the Plastics Pipe Institute and acceptable to the State Materials <br />Engineer. Submit this information to the Director, State Materials Office. <br />SUBARTICLE 948 -4.4 (Page 861) is expanded by the following: <br />948 -4.4.1 Machine Spiral Wound Pipe Liner: Machine spiral wound pipe liner <br />shall consist of a continuous one piece profile strip wound directly into the deteriorated <br />pipelines. The liner can be installed in close fit to the host pipe, or alternatively installed at <br />a fixed diameter. Where the liner is installed at a fixed diameter, the annular space <br />between the spiral wound liner pipe and the existing pipe is grouted. <br />(1) Polyvinyl Chloride: Polyvinyl chloride machine spiral wound pipe <br />liner shall meet the requirements of ASTM F 1697 and shall have a minimum cell <br />classification of 13354. <br />March 2007 01000 -183 03- 4122.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.