My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />N <br />J <br />�-4 <br />0 <br />f <br />L' <br />0 <br />n <br />n <br />u <br />fl <br />C <br />10.2 Failure of the successful Bidder to enter into the Contract in accordance <br />with his Bid, or failure to furnish the required bonds will be just cause for <br />an annulment of the award with the amount of the bid security being <br />forfeited to the Owner as liquidated damages, not as a penalty. <br />10.3 Should a Bid Bond be used, acceptable surety companies shall be <br />determined from the latest United States Treasury Department's list of <br />companies holding certificates of authority as acceptable Sureties on <br />Federal Bonds. Requirements for Acceptable Surety Companies are <br />outlined in Item 15.4. <br />10.4 The Owner may retain the bid security of those Bidders to whom an award <br />may be considered until successful execution of the Contract and bonds; <br />or the specified time for holding bids has elapsed; or all Bids have been <br />rejected. <br />11. MODIFICATION AND WITHDRAWAL OF RID <br />11.1 Prior to the time of bid opening, a Bidder may withdraw his Bid at any <br />time, but may not resubmit it. Bids may not be modified after submittal. <br />11.2 After the bid opening, no Bid may be withdrawn, canceled or modified for <br />a period of 90 days after the time and date designated for the receipt of <br />bids. <br />12. OPENING OF BIDS <br />12.1 Bids submitted will be opened publicly and read aloud at the time and <br />place stated in the Advertisement for Bids. <br />13. GOVERNING LAWS AND REGULATIONS <br />13.1 Bidders shall be familiar with all federal, state, and local laws, ordinances, <br />rules, and regulations that may in any way affect the Work. <br />13.2 Trench Safety Act: The Occupational Safety and Health Administration <br />excavation safety standards, 29 CFR 1926.650 Subpart P trench safety <br />standards will be in effect during the period of construction of the Project. <br />In compliance with current State of Florida statutes, the Bidder shall <br />provide documentation required by the Florida Trench Safety statute to the <br />Owner, in conjunction with the Bid Form. <br />14. LIQUIDATED DAMAGES <br />14.1 The Owner may incur financial loss if the Work is not substantially <br />complete by the date set forth in the Agreement. The Contractor (and his <br />Surety) shall be liable for liquidated damages in accordance with the <br />Supplementary Conditions and the Agreement. <br />Final Version 6/07 00100 -5 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.