Laserfiche WebLink
<br />11ll <br />nn <br /> <br />Beis\Nenger Hoch and Associates <br /> <br />Sunrise January 23, 2008 <br /> <br />CONSULTING ENGINEERS AND PLANNERS <br />PHONE (305) 944-5151 <br />FAX (305) 948-6290 <br /> <br />Mr. Rick Conner <br />Engineering and Public Works Director <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, FI. 33160 <br /> <br />Ref: Central Island Drainage and Street Improvements <br />Clarification of CEI Scope of Services <br /> <br />Dear Mr. Conner: <br /> <br />Per our latest conversation today, I would like to clarify certain services that are <br />included in the scope of work for the construction engineering supervision of this project. <br /> <br />. The Construction Manager proposed by BHA, Patrick Hayes will remain full time <br />during the extent of construction operations. Additionally, George Sokola will <br />assist the Construction Mananer during special construction operations including <br />asphalt operations, drainage well testing. Drainage well operation and capacity <br />verification will be done by the engineer of record (Manuel Vega from BHA). <br /> <br />. Preparation of As-built plans in Auto Cadd for accurate record keeping by the <br />City. <br /> <br />· Density testing with Nuclear Density equipment (Troxler), including the <br />equipment. Proctor testing to be done by independent Soils Testing Laboratory, <br /> <br />. Taking of concrete cylinder samples and slump testing of concrete when needed. <br /> <br />In addition with the additional scope of work that was included as part of our technical <br />involvement in the construction supervision, we have also eliminated the following cost <br />items. <br /> <br />· Hour of Project Manager (meetings) have been reduced from 80 to 50 hours. <br />With the expertise of the proposed CEI staff, there is less need for the Project <br />Manager routine involvement. <br /> <br />· We have eliminated the cost associated with Cadd operator. <br /> <br />· We have eliminated all costs associated with field project expenses. <br /> <br />Hope this will help to clarify that the scope of services included in our proposal IS <br />broader that the outline of services indicated on our letter. <br /> <br />With these changes the revised fee estimate is as follows: <br /> <br />P.O. Box 1368, North Miami Beach, Florida 33160 . 1190 NE 163rd Street, Suite 203, North Miami Beach, Florida 33162 <br />