My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1210
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2015 11:38:25 AM
Creation date
6/12/2008 4:00:51 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1210
Date (mm/dd/yyyy)
01/17/2008
Description
FPL Undergrounding Agrmt - Phase II ($156,460.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Power 8 Light Company, 700 Universe Blv.,Juno Beach, FL 33408-8248 <br /> FPL <br /> December 7, 2007 <br /> Mr. Jorge Vera <br /> Assistant City Manager <br /> City of Sunny Isles Beach <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, FL 33160 <br /> Re: City of Sunny Isles Beach—Overhead to Underground Conversion Project <br /> Phase 2 - N.E. 172 St. from North Bay Road to Collins Avenue <br /> WR # 2842318 <br /> Dear Mr. Vera: <br /> FPL welcomes the opportunity to assist you in determining if underground service is right for your <br /> area. As per your request, we have completed a binding cost estimate for the N.E. 172 Street — Phase <br /> 2 project. The binding estimate amount, known as the Contribution In Aid of Construction (CIAC), <br /> required for converting the area to underground is S179,140.00. This amount is based on the enclosed <br /> design. In addition, the cost estimate includes a more than 5120.000.00 adjustment credit for both <br /> FPL's new Government Adjustment Factor (G.A.F.) waiver and as required in the CIAC formula. <br /> tariff Section 12.1, credit for an equivalent overhead system designed at the current hardened (i.e. <br /> extreme wind) standard. Further the cost assumes the following: <br /> • Rapid trench construction (e.g. no temporary or permanent patching of the roadway, or <br /> replacement of traffic loops) <br /> • All work will be performed during the daylight hours <br /> • Maintenance of Traffic (MOT) — Standard MOT - $47,874.00 allocation. Because MOT <br /> requirements are not in FPL's control, any MOT costs exceeding that presented above. FPL <br /> would require the City to reimburse FPL for any additional MOT costs beyond the standard <br /> charges that FPL reasonably and necessarily incurs to respond to directions from the City or <br /> any other body having authority over the traffic and/or public safety on roads within the <br /> City. <br /> This binding cost estimate is valid for 180 days and a response must be received within that <br /> timeframe. Should you agree to move forward with the project, please sign and return the enclosed <br /> documents. Once we receive the acceptance package (e.g. partially executed documents), we will <br /> commence the construction process (i.e. initiate bid requests and material purchasing). Any deposits <br /> that you have already paid will be applied towards the CIAC and you must pay the remaining <br /> difference of $156,460.00 before we begin construction. However, if you choose to cancel your <br /> request or not respond in time, your engineering deposit will not be returned and the estimate will be <br /> withdrawn. <br /> an FPL Group company <br />
The URL can be used to link to this page
Your browser does not support the video tag.