Laserfiche WebLink
Fifth Revised Sheet No.9.725 <br /> FLORIDA POWER& LIGHT COMPANY Cancels Fourth Revised Sheet No.9.725 <br /> UNDERGROUND FACILITIES CONVERSION AGREEMENT— <br /> GOVERNMENTAL ADJUSTMENT FACTOR WAIVER <br /> This Agreement, which is available to customers that sign the Agreement on or before October 30, 2008, is made and <br /> entered into this I-4" day of Ietc>axr, 20!,,by and between CITY OF SUNNY ISLES BEACH ("Local Government <br /> Applicant"), a Florida municipal corporation or county with an address of 18070 Collins Avenue, Sunny Isles Beach, <br /> Florida 33160 and FLORIDA POWER & LIGHT COMPANY ("FPL"), a Florida corporation with an address of P.O. Box <br /> 14000, 700 Universe Boulevard,Juno Beach, FL 33408-0429. <br /> WHEREAS, the Local Government Applicant has requested that FPL convert certain overhead electric distribution facilities <br /> located within the following boundaries(the"Conversion"): Along Collins Avenue south of N.E. 195 St.to N.E. 189 St.and Flo <br /> Atlantic Blvd. from just N/O N.E. 189 St. to N.E. 185 St. (see attached drawings, WR # 2842355 ) (collectively, the "Existing <br /> Overhead Facilities") to underground facilities, including transformers, switch cabinets and other appurtenant facilities installed <br /> above ground as set forth in Attachment A hereof(collectively,the"Underground Facilities"). <br /> • <br /> NOW THEREFORE, in consideration of the foregoing premises and the covenants and agreements set forth herein, and other <br /> consideration the sufficiency of which is hereby acknowledged, the parties intending to be legally bound, hereby covenant and <br /> agree as follows: <br /> 1. Governmental Adjustment Factor Waiver ("GAF Waiver") Eligibility Criteria. The Local Government Applicant <br /> represents and warrants that it meets the following eligibility criteria for the Conversion: <br /> a. In order for the Conversion to incorporate a sufficient amount of overhead facilities to provide electrical <br /> continuity, the Conversion must include a minimum of approximately 3 pole line miles or approximately 200 <br /> detached dwelling units within contiguous or closely proximate geographic areas(the`Conversion Area"). The <br /> Conversion may be completed in mutually agreed upon phases, with the project size minimums applying to the <br /> aggregate project — provided that any necessary subsequent phase begins within a I year period from <br /> completion of the prior phase and the minimums are met within,at most,3 phases;and <br /> b. The Local Government Applicant must require all customers within the Conversion Area who currently have <br /> overhead service directly from the Existing Overhead Facilities to convert their service entrances to <br /> underground within 6 months of completion of the Underground Facilities installation or each phase thereof; <br /> and <br /> c. The Local Government Applicant must be willing and able to execute a right of way("ROW')agreement with <br /> FPL if the Local Government Applicant requests that facilities be placed in the ROW;and <br /> d. For any affected laterals,the complete lateral must be convened, including all stages of any multi-stage lateral; <br /> and <br /> e. There are no state or federal funds available to the Local Government Applicant to cover any portion of the cost <br /> of the Conversion. <br /> Special Circumstances. Conversions which do not meet the project size minimums described in section 1.a are <br /> eligible for the GAF Waiver in the following special circumstances: <br /> i. 100%of the Existing Overhead Facilities within the Local Government Applicant's corporate limits <br /> are to be converted,but are less than the pole line mileage or dwelling unit minimums;or <br /> ii. A single lateral that serves at least one Critical Infrastructure Facility as determined by the <br /> appropriate local agency with the mutual agreement of FPL;or <br /> iii. An island or peninsula where 100%of the Existing Overhead Facilities are to be convened;or <br /> (Continued on Sheet No.9.726) <br /> - <br /> Issued by: S. E. Romig,Director,Rates and Tariffs <br /> Effective: May 4,2007 <br />