My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1274
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1274
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:43 AM
Creation date
6/26/2008 5:24:59 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1274
Date (mm/dd/yyyy)
06/19/2008
Description
Emergency Bridge Design Authorization
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Honorable City Commission <br />June 19,2008 <br />Page 2 <br /> <br />vehicles during emergencies, the weight bearing capacity of the structure has to be that of a <br />standard vehicular bridge. <br /> <br />Thus in terms of added construction costs, we are essentially looking at signalization and traffic <br />circles. It is estimated this cost will be in the area of Two Hundred Fifty Thousand Dollars <br />($250,000.00) <br /> <br />As always please feel free to contact me should you have any questions. <br /> <br />AJS/iw <br /> <br />cc: Hans Ottinot, City Attorney <br />Jorge L. Vera, Assistant City Manager, Service Division <br />Doug Haag, Assistant City Manager, Finance Division <br />Rick Conner, Public Works and Engineering Director <br />Bill Evans, Assistant Public Works Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.