Laserfiche WebLink
<br />D, Responsibilitv to locate eXlstln~ water t'acilities. NMB shall be responsible to <br />locate the existing water I~Kilities. upon receipt ot' locate tickets. and comply with the state ot' <br />Florida's "Sunshine State One call system." All locate tickets shall be provided to the general <br />contractor. <br /> <br />E. Responsibilitv as Engineer of record. NMB shall act as the Engineer of record <br />(for the water main installation only) to certify the complete installation in accordance with the <br />approved plans permitted with th; Florida Department of Health. <br /> <br />Section 7. Communications with Contractor. All communications made between <br />NMB and the contractor shall be routed through Ihe City or its agents. <br /> <br />Section 8. Meter Boxes, <br /> <br />A. Assessment of meter boxes. NMB shall make an assessment of broken meter boxes, <br />and provide any necessary replacement boxes to the City, prior to construction of the Project. <br />The City or its general contractor shall be responsible for replacing any water meter broken <br />during the construction of the Project. <br /> <br />B. Meter Relocation. The City and the general contractor shall be responsible for <br />relocation of water meters and associated plumbing work necessary to complete the Project. <br /> <br />C. Floating Construction Meter. The City or its contractor shall secure a floating <br />construction meter from NMB Engineering Division office prior to commencement of <br />construction for the use of any water during the Project. <br /> <br />Section 9. Transfer of System. The City and the general contractor agree to transfer all <br />water service meters from the old system to the new system after testing, acceptance. and <br />certification of the facilities. The City or its general contractor shall be responsible for final <br />connection of the new system. <br /> <br />Section 10. Dama2:c to Property. NMB shall not be responsible for any property <br />damage caused by the City or its general contractor during the construction of the Project. The <br />City or its general contractor shall be responsible for repairing all roadways. driveways. and <br />landscaping that requires removal during the construction of the Project. The general contractor <br />shall be responsible for repairing any and all water main or water service breaks caused by the <br />general contractor or its agents. Any costs associated for repairing a water main or water service <br />breaks are the responsibi I i ty of the general contractor. <br /> <br />Section 1 J. Waiver of Fees. NMB agrees to waive any administrative fees that it would <br />not otherwise charge itself including.. but not limited to. deposits to secure a floating construction <br />meter. <br /> <br />Section 12. Compliance with laws. The City ag.rees to comply with applicable federal. <br />state and local laws. code. ordinances, rules and regulations. and A WW A standards in <br />constructing the Project. <br /> <br />Page J <br />