Laserfiche WebLink
<br /> <br />To: <br /> <br />Via: <br /> <br />From: <br /> <br />Date: <br /> <br />Re: <br /> <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />City Commission <br />Norman S. Ede1cup, Mayor <br />Lewis J. Thaler, Vice Mayor <br />Roslyn Brezin, Commissioner <br />Gerry Goodman, Commissioner <br />George "Bud" Scholl, Commissioner <br /> <br />(305) 947-0606 City Hall <br />(305) 947-2150 Building Department <br />(305) 949-3 1 1 3 Fax <br /> <br />A. John Szerlag. City Manager <br />Hans Ottinot, City Attorney <br />Jane A. Hines, CMC, City Clerk <br /> <br />MEMORANDUM <br /> <br />The Honorable Mayor and City Commission <br /> <br />A. John Szerlag, City Manager <br /> <br />Jorge Vera, Assistant City Manager <br />Rick Conner, Director of Public Works <br /> <br />November 18, 2008 <br /> <br />Waiver of Bidding Requirements for a contract with Southeastern Engineering <br />Contractors to construct the new retaining wall at Oceania Park in an amount <br />not to exceed $80,062.96. <br /> <br />RECOMMENDATION <br />It is recommended that the City Commission waive the Bidding Requirements for a contract with <br />Southeastern Engineering Contractors to construct the new retaining wall at Oceania Park in an <br />amount not to exceed $80,062.96. <br /> <br />BACKGROUND <br />The City entered into a contract with Southeastern Engineering Contractors to construct the <br />Central Island Drainage Project. Their reference checks were very good and they have worked <br />very well with us so far. To save a great deal of time, we would like to have the Commission <br />approve a contract to allow them to also build the retaining wall at Oceania Park in an amount <br />not to exceed $80,062.96. This is specialty work that requires qualified workers and specific <br />types of equipment. We not only did our own estimate, but we also got quotes from three of the <br />contractors currently doing work for the City and this is the lowest by far. City staff will then <br />work to get the old concrete removed and use our Public Works crews to place the new soil, <br />sidewalk and amenities. To take this action we must, under Section 62-12 of the Code, request a <br />waiver of the bidding requirements. This section reads as follow: <br /> <br />~ 62-12. Waiver of competitive bidding procedures. The City Commission may authorize the waiver of <br />competitive bidding procedures upon the recommendation of the City Manager that it is in the City's best <br />interest to do so, to obtain goods and services which cannot be acquired through the normal purchasing <br />process due to insufficient time, the nature of the goods or services, or other factors. Purchases <br />authorized by waiver process shall be acquired after conducting a good faith review of available sources <br />and negotiation as to price, delivery and terms. <br /> <br />Finance Department <br /> <br /> <br />Commission Meeting Date: <br /> <br /> <br />Funding available: <br /> <br /> <br /> <br />Agenda Item No.: <br /> <br />l <br />1\-1 ~ -O~ <br /> <br />Covcr Memo Southcastern Eng i\gmt Oceania l'k Rctaining Wall <br />