My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2009-1384
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2009
>
Reso 2009-1384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 1:31:41 PM
Creation date
2/26/2009 2:52:13 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2009-1384
Date (mm/dd/yyyy)
02/19/2009
Description
MDC Public Schools Drainage and Traffic Mtc Payment ($754,743.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />To: <br />From: <br />Date: <br />Page: <br /> <br />Dennis E. Caserta <br />A. John Szerlag, <br />February 25. 2008 <br />2 <br /> <br />entire cost being assigned to the City). The City will also be responsible <br />for all subgrade work, proper placement of base, and asphalt pavement <br />costs. <br /> <br />The school will be responsible for concrete curb and gutter on the east side <br />as well as a 5 foot wide concrete sidewalk. <br /> <br />D. Atlantic Boulevard - the City will be responsible for concrete curb and <br />gutter on the east side. <br /> <br />The school will be responsible for concrete curb and gutter on the west <br />side as well as a 5 foot wide concrete sidewalk. <br /> <br />All sub grade work, proper placement of base and asphalt pavement costs <br />will be shared equally between the City and School. <br /> <br />E. Drainage - the School District will be responsible for installation of five <br />drainage wells, and the City will be responsible for installation of three <br />drainage wells. <br /> <br />F. One contractor performing the work - it just makes sense to have one <br />contractor perform the above scope of work. Your contractor can perform <br />this work within three months, The City's contractor can perform this <br />work in three months as well, and can do so for less money. Thus while I <br />agree to have the school's contractor perform the above scope of work on <br />behalf of the City, I can only do so using the City's contractor unit pricing <br />for the City's share of the above referenced work. Of course, all work will <br />be performed to the City's specifications, and approved by the City. In <br />addition, the City will pay monthly upon invoice a on approval of <br />work. The City's contribution will not exceed 449,422 Director of <br />Engineering and Public Works Rick Conner analyze the unit pricing and <br />his work is attached, which reflects our last discussio of shared costs. <br /> <br />Please advise if you agree with this proposal. If affirmati e, Mr. Hans Ottinot, <br />City Attorney, will develop an interlocal agreement for us to execute. <br />\ <br /> <br />J1 4 ~y I () bS' ~ U."J< 0.& <br />c... ot,ti-L.. <br />10' #o.,I+'.PV"PoJ V <br /> <br />~'l31~8 <br /> <br />~11)l. :;c1lGol I Jr"jllagc. 1';, <br /> <br />I I\:nl, ~'i IntI n.lllll <br /> <br />:IHlc <br /> <br />lib <br /> <br />,tl <br />
The URL can be used to link to this page
Your browser does not support the video tag.