Laserfiche WebLink
<br />AE5PRECAST <br /> <br />3851 1 Jlh St. Northport, AL 35476 <br />Toll Free: (800) 342-3274 <br />Phone: (205) 333-8000 <br />Fax (205) 333-0181 <br />Wehsite: www.aesvrecast.com <br />email: sales@aesvrecast.com <br /> <br />PRECAST CONCRETE BUILDING SYSTEMS <br /> <br />Crane Rental for Offloading is Included. Lifting Bolts for Initial Offloading Included. <br /> <br />Weight: =60,000 Lbs. <br /> <br />Note: Production schedule is based upon date of Purchase Orders. <br /> <br />Thank you, <br /> <br />Brad Lee <br />AES Precast Co, Inc. <br />Blee@aesprecast.com <br />800.342.3274 <br /> <br />Payment terms Net 30. Invoice to be paid in full within (6) six months of building completion. Delivery required within (1) one year of building completion. Final electrical and <br />plumbing connections to be made by others as well as site work unless otherwise noted. Contractor must provide level unobstructed area large enough for crane and tractor <br />trailer to park adjacent to pad. Crane must be able to place outriggers within 3'-0" of edge of pad and truck and crane must be able to get side-by-side under their own power. If <br />AES Precast is supplying the crane. no overhead lines or piping may be within 75' radius of center of pad and no building shall be placed closer than 2'-0" to an existing <br />structure. Firm roadbed with turns that allow 65' lowbed tractor and trailer must be provided directly to site. AES Precast is a GSA Contract Vendor. Price good for 90 days from <br />above date. Standard exterior finish of exposed aggregate will be chosen if no choice is made. <br /> <br />.J <br />