Laserfiche WebLink
<br />D <br /> <br />o <br /> <br />g <br /> <br />g <br /> <br />m <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />EXHIBIT A <br />172nd Street Road Improvements <br /> <br />Bid Estimated Unit Estimated <br />Item Description Quanity Unit Price Total <br />~~~ ~~~~~~~~~l~3\~~~~~~~C~\~~t~lt~~~t~~:~'~f~ i~;'~;jf~~~~q.{~~ ~~i}~;~~ fr,f"<i~"'tf~:~;1!:~.~.~~ .~Il"'~")~""'\'. .. '.~'~,.II~ <br />,.. . .~. l~.'l.' _t; .. .''''' .. <br />~.~'t1fi;;...~*...~,:.:r.Lt.,... ~~'~1 ~~.,,;'-;~~::,;::i;"', :;..;~~~:r-~ <br />I. General <br />1 Mobilzation per FOOT 1<5%) 1 LS $50,000.00 $50,000.00 <br />2 Maintenance of Traffic per FOOT including temporary <br />. striping and signage, barricades. barriers, arrow panels, <br /> etc. as required. 1 LS $70,000.00 $70,000.00 <br />3 Clearing and Grubbing 1 LS $40,000.00 $40,000.00 <br />4 Pollution Prevention and Sediment Control 1 LS $5,000.00 $5.000.00 <br />5 Earthwork 1 LS $25.000.00 $25,000.00 <br />6 Relocation of existing mail box 1 LS $150.00 $150.00 <br /> General Subtotal $190,150.00 <br />II. Civil <br />A. Demolition/Site Preparation <br />7 Asphalt pavement demolition (removal & hauling) 4,936 SY $4.00 $1 9.744.00 <br />8 Concrete sidewalk demolition (removal & hauling) 1,210 SY $9.00 $10,890.00 <br />9 Catch basin to be abandoned in place and filled with <br /> flowable flow 15 CY $100.00 $1,500.00 <br />10 Existing drainage pipes to be filled with flow able flow <br /> 80 CY $100.00 $8,000.00 <br />11 Relocate or adjust existing street signs. 3 EA $150.00 $450.00 <br />B. Paving <br />12 1-1/2" Asphalt, type S.3 550 TN $110.00 $60,500.00 <br />13 12" Stabilized subgrade 5,376 SY $10.00 $53,760.00 <br />14 8" Limerock 1,076 CY $60.00 $64,560.00 <br />15 4" Concrete sidewalk 1.522 SY $45.00 $68,490.00 <br />16 6" Concrete driveway 379 SY $65.00 $24,635.00 <br />17 Drop curb 422 LF $20.00 $8,440.00 <br />18 Type F curb and gutter 2.415 LF $20.00 $48.300.00 <br />C. Striping and Signs <br />19 Thermoplastic STO white solid 6" 0.60 NM $3,000.00 $1,800.00 <br />.20 Turn arrows 8 EA $100.00 $800.00 <br />21 RPM amber/amber 106 EA $5.00 $530.00 <br />22 RPM colorless/red 7 EA $5.00 $35.00 <br />23 R2-1 24" x 30" speed limit sign 3 EA $300.00 $900.00 <br />24 R3-5R Right turn lane sign 1 EA $300.00 $300.00 <br />25 R3-5L Left turn lane sign 1 EA $300.00 $300.00 <br />26 6" Double yellow 0.60 GM $5.000.00 $3,000.00 <br />27 Pavement message (ONLY) 2 EA $120.00 $240.00 <br />28 R3-7L Left lane must turn lelt 2 EA $250.00 $500.00 <br />29 Wl-1 a III Right turn lane and speed 1 EA $250.00 $250.00 <br />30 Wl-1a ILl Left turn and speed 1 EA $250.00 $250.00 <br />31 10'.30' Skip white line 0.30 GM $4.000.00 $1.200.00 <br /> I <br /> <br />06/07 <br /> <br />Exhibit A-1 <br /> <br />03-4197 <br />