My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2587
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2587
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2016 4:14:34 PM
Creation date
9/29/2016 4:14:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2587
Date (mm/dd/yyyy)
09/15/2016
Description
Ratify 3rd Amd to Agmt w/Craig A. Smith & Assoc. Engineering Srvs 174th St. Impr.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRAIG A. SMITH & ASSOCIATES <br /> 7777 Glides Road - Suite 410 - Boca Raton,Florida 33434 <br /> • <br /> COMA/MC B.1111.ZERS • SURVEYORS •UT2I1TY LOCATORS •GRANT SPECLLLETS W W W . C 8 A 1 C A S M 1 T H . C 0 Y. <br /> January 8, 2014 <br /> Ms. Helen Gray, P.E. <br /> City Engineer <br /> City of Sunny Isles Beach <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, FL 33160 <br /> RE: 174th Street Storm Water and Pavement Improvements <br /> Dear Ms. Gray, <br /> Per our meeting with Elka Linton-Dorsett and Bill Evans, the City has determined that <br /> they wish to perform a full reconstruction of 174th Street from Collins Avenue to North <br /> Bay Road and a complete milling and resurfacing from North Bay Road to the western <br /> terminus of 174th Street. The preference is also to extend the stormwater system to the <br /> west to tie into the North Bay Road outfall. In addition, the City would like to reconstruct <br /> sidewalk as needed to include ADA compliance, provide traffic calming devices, replace <br /> curb and gutter as needed, minimize median openings, add conduit sleeves to medians <br /> for future use, include a construction phasing plan to provide uninterrupted use of City <br /> Bus Shelters and landscape within the right of way and project limits. <br /> Due to the assumed subsurface conditions, a geotechnical evaluation will be required to <br /> determine the extent of the existing unsuitable material and establish a suitable <br /> roadway cross section to properly support the roadway infrastructure and its <br /> components. Depending on the outcome of the geotechnical testing, it may be <br /> necessary to provide a structural reinforcement to the base material in the form of geo- <br /> grid or alternative as well as possible structural support foi drainage structures. <br /> The City has also requested that CAS prepare the necessary contract documents and <br /> specifications for the project, oversee the bid process and contract award for <br /> construction. <br /> Lastly, it is understood that in the future, the City would like CAS to perform adequate <br /> site inspection and engineering services during construction to provide final project <br /> certification. <br /> CAS is pleased to provide the required services needed to complete the described <br /> project. The limits of the project will be on 174th Street beginning at the east end at <br /> Collins Avenue (SR-A1A) to western limits of 174th Street. Also included will be <br /> necessary Survey of North Bay Drive from approximately 260 feet north of 174th Street <br /> to approximately 300 feet south of 174th Street. The total linear footage of the project is <br /> approximately 2,515 feet, just less than one half mile. <br /> . 954 . ] 12 . 822.2 - -56:1 . ] ATTACHMENT "A" 305 . 46 1.. 4410 V I <br /> 954 . ) 86 . 8927 791 . 9818 <br />
The URL can be used to link to this page
Your browser does not support the video tag.