My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2009-1460
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2009
>
Reso 2009-1460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:43:09 AM
Creation date
11/19/2009 11:37:49 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2009-1460
Date (mm/dd/yyyy)
09/17/2009
Description
Ratify Agmt Tally Eng Threshold Inspection Srvs:Heritage Pkg Garage RFQ 09-05-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HERITAGE PARK AND PARKING GARAGE <br />CITY OF SUNNY ISLES BEACH <br />MIAMI-DADE COUNTY, FLORIDA <br /> <br />July 31, 2009 <br />RFQ-NO 09-03-01 <br />(Revision) <br /> <br />. Civil engineer to verify the placement of pipe, box culverts and all structures prior to <br />backfilling operation; <br />. Engineering technicians at the job site to perform in-place field density tests in <br />accordance with ASTM D-2922 (Nuclear Gauge Method); <br />. Record the deep well report and verify the length of the deep well; <br />. Inspe~t and approve all open infiltration; <br />. Inspect and approve asphalt placement; <br />. Inspect and approve all signings and pavement markings; <br />. Inspect and approve water and sewer connections; <br />. Upon completion of the assigned work the engineer shall complete and sign the <br />appropriate forms certifying that to the best of his knowledge the work is in <br />conformance with the approved plans and specifications, and the applicable <br />workmanship provisions of the code. <br /> <br />G. SCOPE OF WORK FOR CONSTRUCTION MANAGER (optional) <br /> <br />Responsibility of the onsite or of site construction manger: <br /> <br />. Meetings <br />o Arrange, schedule and Conduct the preconstruction meeting. <br />o Schedule and Conduct weekly meeting with the Prime and the subcontractors <br />and professionals if required or requested. <br />o Monitor the mandatory Weekly Safety meeting. <br />o Verify daily toolbox safety meetings by contractors <br />. Construction manager shall review emergency procedures for proper <br />compliance for jobsite emergencies, location of nearest hospital, <br />hurricane lock down, etc. <br />. Construction manager shall request all contractors to submit <br />documentation proving qualification and compliance for all <br />machinery operators. <br /> <br />. Monitor <br />o Review, log, monitor and track the Requests for Information (RFIs) to make <br />sure that all the RFIs are answered and I and items are closed. <br />o Review, log and monitor the shop drawings to make sure that all the shop <br />drawings are submitted to the professionals, approved and distributed to the <br />contractor in accordance to the contract. <br />o Review and monitor the as built drawings from begin construction to the <br />End. <br />o Make sure that at all times all the Safety issues are being followed and any <br />unsafe issues are resolved by the contractor. <br />o Construction manager is responsible to make sure that contractor is keeping <br />the project clean and safe at all times. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.