My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Continuation Sheets: <br />1. Fill in total list of scheduled component items of work, with item number <br />and scheduled dollar value for each item. <br />2. Fill in dollar value in each column for each scheduled line item when work <br />has been performed or products stored. <br />a. Round off values to nearest dollar, or as specified. <br />3. List each Change Order Number, and description, as for an original <br />component item or work. <br />a. List by Change Order Number, and description, as for an original <br />component item or work. <br />1.05 SUBSTANTIATING DATA FOR PROGRESS PAYMENTS <br />A. When the Owner or the Engineer requires substantiating data, Contractor shall <br />submit suitable information, with a cover letter identifying: <br />1. Project <br />2. Application number and date <br />3. Detailed list of enclosures <br />4. For stored products: <br />a. Item number and identification as shown on application. <br />b. Description of specific material. <br />B. Submit one copy of data cover letter for each copy of application. <br />C. As a prerequisite for payment, Contractor is to submit a "Surety Acknowledgment <br />of Payment Request" letter showing amount of progress payment, which the <br />Contractor is requesting. <br />D. The Contractor shall maintain an updated a set of drawings to be used as a <br />record drawings in accordance with Section 01720. As a prerequisite for monthly <br />progress payments, the Contractor shall submit the updated record drawings for <br />review by the Engineer. <br />E. Construction schedule in accordance with 01310. <br />1.06 PREPARATION OF APPLICATION FOR FINAL PAYMENT <br />A. Fill in Application form as specified for progress payments. <br />B. Use continuation sheet for presenting the final statement of accounting as <br />specified in Section 01700 - Contract Closeout. <br />C. Submit final record drawings. <br />1.07 SUBMITTAL PROCEDURE <br />A. Submit Applications for Payment to the Engineer at the times stipulated in the <br />Agreement. <br />05/08 01152 -2 05 -4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.