My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br />' E. Furnish incidental labor and facilities: <br />1. To provide access to Work to be tested <br />' 2. To obtain and handle samples at the Project site or at the source of the <br />product to be tested <br />' 3. To facilitate inspections and tests <br />4. For storage and curing of test samples <br />F. Notify laboratory sufficiently in advance of operations to allow for laboratory <br />assignment of personnel and scheduling of tests. <br />' G. Employ and pay for the services of the same or a separate, equally qualified <br />independent testing laboratory to perform additional inspections, sampling and <br />' testing required for the Contractor's convenience. <br />H. Provide the Engineer with a copy of all test and reports. <br />' 1.05 TYPES OF TEST REQUIRED <br />A. Density tests for trench backfill at the rate of three tests per lift in 1,000 feet of <br />' trench. <br />B. Density tests for subgrade compaction at the rate of three tests in 1,000 feet of <br />roadway. <br />05/08 01410 -2 05 -4893 <br />1.04 CONTRACTOR'S RESPONSIBILITIES <br />' <br />A. <br />Cooperate with laboratory personnel, and provide access to Work and pay for <br />testing. <br />B. <br />Secure and deliver to the laboratory adequate quantities of representational <br />samples of materials proposed to be used and which require testing. <br />' <br />C. <br />Provide to the laboratory the preliminary design mix proposed to be used for <br />concrete, and other materials mixes which require control by the testing <br />laboratory. <br />' <br />D. <br />Materials and equipment used in the performance of work under this Contract are <br />subject to inspection and testing at the point of manufacture or fabrication. <br />' <br />Standard specifications for quality and workmanship are indicated in the Contract <br />Documents. The Engineer may require the Contractor to provide statements or <br />certificates from the manufacturers and fabricators that the materials and <br />equipment provided by them are manufactured or fabricated in full accordance <br />' <br />with the standard specifications for quality and workmanship indicated in the <br />Contractor Documents. All costs of this testing and providing statements and <br />certificates shall be a subsidiary obligation of the Contractor, and no extra charge <br />' <br />to the Owner shall be allowed on account of such testing and certification. <br />' E. Furnish incidental labor and facilities: <br />1. To provide access to Work to be tested <br />' 2. To obtain and handle samples at the Project site or at the source of the <br />product to be tested <br />' 3. To facilitate inspections and tests <br />4. For storage and curing of test samples <br />F. Notify laboratory sufficiently in advance of operations to allow for laboratory <br />assignment of personnel and scheduling of tests. <br />' G. Employ and pay for the services of the same or a separate, equally qualified <br />independent testing laboratory to perform additional inspections, sampling and <br />' testing required for the Contractor's convenience. <br />H. Provide the Engineer with a copy of all test and reports. <br />' 1.05 TYPES OF TEST REQUIRED <br />A. Density tests for trench backfill at the rate of three tests per lift in 1,000 feet of <br />' trench. <br />B. Density tests for subgrade compaction at the rate of three tests in 1,000 feet of <br />roadway. <br />05/08 01410 -2 05 -4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.