My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.03 TEMPORARY WATER <br />A. Arrange with the Owner to provide water for construction purposes. <br />B. Install branch piping with taps located so that water is available throughout the <br />construction by the use of hoses. <br />C. Install at each and every connection to the Owner water supply a backflow <br />preventor meeting the requirements of ANSI A40.6, latest revision. Contractor <br />shall be required to meter all water used. <br />2.04 TEMPORARY SANITARY FACILITIES <br />A. Provide sanitary facilities in compliance with laws and regulations. <br />B. Service, clean and maintain facilities and enclosures. <br />2.05 TEMPORARY HEAT AND VENTILATION <br />A. Provide temporary heat and ventilation as required to maintain adequate <br />environmental conditions to facilitate progress of the Work, to meet specified <br />minimum conditions for the installation of materials, and to protect materials and <br />finishes from damage due to temperature or humidity. <br />B. Provide adequate forced ventilation of enclosed areas for curing of installed <br />materials, to disperse humidity, and to prevent hazardous accumulations of dust, <br />fumes, vapors or gases. <br />C. Portable heaters shall be standard approved units complete with controls <br />D. Pay all costs of installation, maintenance, operation and removal, and for fuel <br />consumed. <br />E. Provide connections to existing facilities, extend and supplement with temporary <br />units as required to comply with requirements. Pay all costs of installation, <br />maintenance, operation and removal. Owner will pay costs of fuel used from the <br />existing system. <br />2.06 TEMPORARY TELEPHONE SERVICE <br />A. Arrange with local telephone service company, provide direct line telephone <br />service at the construction site for the use of personnel and employees. Service <br />required: <br />1. One direct line instrument in Contractor's Field Office for Dade County. <br />2. One direct line instrument in Field Office of Engineer with local access <br />from Dade County. <br />3. One direct line facsimile (FAX) machine in Contractor's Field Office. <br />11 05/08 01510 -2 05 -4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.