My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.04 RECORDING <br />A. Label each document "PROJECT RECORD" in neat large printed letters. <br />B. Record information concurrently with construction progress. <br />C. Drawings; Legibly mark record actual construction: <br />1. Depths of various elements of foundation in relation to finish grade <br />elevations. <br />2. All underground piping with elevations and dimensions. Changes to <br />piping location. Actual installed pipe material, class, etc. <br />3. Location of internal utilities and appurtenances concealed in the <br />construction, referenced to visible and accessible features of the <br />structure. <br />4. Field changes of dimensions and details. <br />5. Changes made by Field Order or by Change Order. <br />6. Details not on original contract drawings. <br />7. Equipment and piping relocations. <br />D. Specifications and Addenda; legibly mark each Section to record: <br />1. Manufacturer, trade name, catalog number and supplier of each product <br />and item of equipment actually installed. <br />2. Changes made by field order or by Change Order. <br />E. Shop Drawings (after final review and approval): <br />1. One set of record shop drawings for each process equipment, piping, <br />(including casings) electrical system and instrumentation system. <br />1.05 SUBMITTAL <br />A. At Close -out, deliver Record Documents to the Engineer for the Owner. <br />B. Accompany submittal with transmittal letter in duplicate, containing: <br />1. Date <br />2. Project Title and Number <br />3. Contractor's Name and Address <br />4. Title and Number of each Record Document <br />05/08 01720 -2 05 -4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.