Laserfiche WebLink
SECTION 03300 <br />CAST -IN -PLACE CONCRETE <br />PART 1 - GENERAL <br />1.01 <br />WORK <br />INCLUDED <br />A. <br />Furnish labor, materials, equipment and incidentals required to place cement and <br />concrete masonry, reinforcing steel, forms, waterstops and miscellaneous related <br />items including sleeve, reglets, anchor bolts, inserts and embedded items specified <br />under other Section. <br />1.02 <br />RELATED WORK <br />A. <br />Concrete reinforcement is specified in Section 03200. <br />1.03 <br />REFERENCE <br />A. <br />ASTM C -150 Portland Cement <br />B. <br />FS SS -C- 1960/3 Portland Cement <br />C. <br />ASTM C -94 Ready -Mix Concrete <br />D. <br />ACI 318 -89 Reinforced Concrete <br />E. <br />ASTM C -143 Concrete Mix <br />F. <br />ASTM C -231 Concrete Testing <br />G. <br />ASTM C -33 Concrete Aggregates <br />H. <br />ASTM C -87 Mortar Strength <br />I. <br />ASTM C -40 Concrete Aggregates <br />J. <br />ASTM C -494 Concrete Ad Mixtures <br />K. <br />ACI 304 Truck Mixers <br />L. <br />ASTM C -31 Field Testing <br />M. <br />ASTM C -39 Concrete Testing <br />N. <br />ASTM C -42 Concrete Testing <br />1.04 <br />DESCRIPTION <br />A. <br />Concrete shall be of Portland cement, ASTM C -94, fine aggregate, coarse <br />aggregate, water and admixtures as specified and shall be ready- mixed, or <br />transit -mixed concrete. All constituents, including admixture, shall be batched at <br />the central batch plant. <br />05/08 03300 -1 05 -4893 <br />