My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1322
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 3:52:39 PM
Creation date
2/23/2009 11:03:30 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1322
Date (mm/dd/yyyy)
09/18/2008
Description
1st Addendum to Agmt w/AT&T, Phase II Wireless Island Project St. Level Coverage
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sunny Isles Communicty Center- Town Center Park - Phase 2 WYFI support for Margolis and Atlantic - A TT <br />Quote 9-8-2008 rev! (2) <br /> <br />Scope of Work: <br />1. Provide and install one (1) 22' 6" aluminum pole with concrete base, painted black, (per <br />City of Sunny Isles provided document) at each city park listed below. (Electrical arm <br />and light fixture not included). <br />· Margolis Park <br />· Atlantic A venue. <br />2. Install one (1) Customer provided 22' 6" aluminum pole with concrete base, painted <br />black, (per City of Sunny Isles provided document) at Town Center Park. <br />3. Install twenty (20) AP 's and/or antennas at various locations on city owned poles. <br />4. Provide and install120V power outlets feeding antennas and APs. <br />5. City of Sunny Isles is to remove and restore landscape materials, fencing and/or any <br />obstruction where required to safely access work area. <br />6. All pole locations must be identified by AT&T with concurrence from City of Sunny Isles <br />prior to project commencement and pending public underground locator clearance to be <br />peiformed by Sunshine Locators. <br />7. AT&T is to supply all antennas, access points and mounting hardware requiredfor <br />project completion. <br />8. AT&T is to provide all safety traffic cones and barricades were needed. <br />9. Pricing includes all labor and materials required for project completion. <br />10. Wind load certification is not included. <br />,11. Not responsible for weather delays and/or delivery delays beyond our control. <br />12. It is assumed all locations have sufficient power. <br />13. Pole manufacturer will not commit to delivery date until firm order has been placed, <br />(normally is four to six weeks). <br />14. It is assumed existing conduits and city owned poles are in good working condition. <br /> <br />Specifications / Testing / Documentation / Provided Services: <br />· This scope of work is based on 8-hour shifts commencing after 7:00 AM, Monday <br />through Friday, excluding holidays observed. <br />· It is assumed that AT&T and our authorized installation subcontractor Meisner Datacom <br />will have ready access after notification to all areas necessary to complete scope of work. <br />· Project Manager and Single Point of Contact, (SPOC), shall be assigned during and post <br />implementation until project is completed. <br />· All work will be peiformed in accordance with local codes governing the installation of <br />new wire and cable used for electrical and/or communications purposes. If no local code <br />exists, pertinent sections of the National Electrical Code of 2008 will be observed. <br />· All materials shall be UL listed and approved. <br /> <br />The information contained in this proposal is proprietary to BellSouth and is offered solely for the purpose of evaluation, <br />It may not be disclosed to third parties without prior written permission from BellSouth, Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.