My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o <br />I <br />I <br />I <br />I <br />g <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3. Note related record drawing information and Product Data. <br /> <br />D. Record Product Data: Maintain one copy of each Product Data submittal. <br /> <br />1. Mark these documents to show significant variations in actual VVork <br />performed in comparison with information submitted. Include <br />variations in products delivered to the site, and from the <br />manufacturer's installation instructions and recommendations. <br />2. Give particular attention to concealed products and portions of the <br />Work which cannot otherwise be readily discerned later by direct <br />observation. <br />3. Note related Change Orders and mark-up of record drawings and <br />Specifications. <br /> <br />E. Record Sample Submitted: Immediately prior to the date or dates of <br />Substantial Completion, the Contractor will meet at the site with the <br />Engineer and the Owner to determine which of the submitted Samples <br />that have been maintained during progress of the Work are to be trans- <br />mitted to the Owner for record purposes. Comply with delivery to the <br />Owner's Sample storage area. <br /> <br />F. Miscellaneous Record Submittals: Refer to other Specification Sections <br />for requirements of miscellaneous record-keeping and submittals in <br />connection with actual performance of the Work. <br /> <br />G. At Contract close-out, deliver one copy of Record Documents to Engineer <br />for Owner. Accompany submittal with transmittal letter in duplicate <br />containing the following information: <br />1. Date. <br />2. Project title and number. <br />3. Contractor's name and address. <br />4. Title and number of each Record Document. <br />5. Signature of Contractor or his authorized representative. <br /> <br />PART 2 - PRODUCTS (Not Applicable) <br />PART 3 - EXECUTION <br /> <br />3.01 FINAL CLEANING <br /> <br />A. Remove temporary protection and facilities installed for protection of the <br />Work during construction. <br /> <br />04/08 <br /> <br />01701-4 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.