My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 01740 <br /> <br />WARRANTIES AND BONDS <br /> <br />PART 1 - GENERAL <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />A. Compile specified warranties and bonds, as in Articles 5 and 13 of the <br />General Conditions and Section 01030 of these Specifications. <br /> <br />B. Co-execute submittals when so specified. <br /> <br />C. Review submittals to verify compliance with Contract Documents. <br /> <br />D. Submit to the Engineer for review and transmittal to Owner. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />A. Instructions to Bidders: Bid or Proposal Bonds <br /> <br />B. Conditions of the Contract: Performance Bond and Payment Bond <br /> <br />C. Section 01030: Special Project Procedures <br /> <br />D. <br /> <br />Section 01700 <br /> <br />Contract Closeout <br /> <br />1.03 SUBMITTAL REQUIREMENTS <br /> <br />A. Assemble warranties, bond, service and maintenance contracts, executed <br />by each of the respective manufacturers, suppliers, and subcontractors. <br /> <br />B. Number of original signed copies required: two each. <br /> <br />C. Table of Contents: neatly typed, in orderly sequence. Provide complete <br />information for each item. <br />1. Product or work item <br />2. Firm, with name of principal, address and telephone number <br />3. Scope <br />4. Date of beginning of Warranty, bond or service and maintenance <br />contract <br />5. Duration of warranty, bond or service maintenance contract <br />6. Provide information for Owner's personnel: <br />a. Proper procedure in case of failure <br />b. Instances which might affect the validity of warranty or bond <br /> <br />04/08 <br /> <br />01740-1 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.