Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />04/08 <br /> <br />F. <br /> <br />E. <br /> <br />3. Maintain sides and slopes of excavations In safe condition until <br />completion of backfilling. <br />Shoring and Bracing: <br />1. Establish requirements for trench shoring and bracing to comply <br />\Nith loca! codes and authorities having jurisdiction. <br />2. Maintain shoring and bracing in excavations regardless of time <br />period excavations will be open. Carry down shoring and bracing <br />as excavation progresses. <br /> <br />Dewatering: <br />1. Prevent surface water and subsurface or ground water from flowing <br />into excavations. <br />2. Do not allow water to accumulate in excavations. <br />3. Provide and maintain pumps, well points, sumps, suction and <br />discharge lines, and other dewatering system components <br />necessary to convey water away from excavations. <br /> <br />G. <br /> <br />Stockpile satisfactory excavated materials where directed, until required <br />for backfill or fill. Place, grade and shape stockpiles for proper drainage. <br /> <br />H. <br /> <br />Excavation for Trenches: Dig trenches to the uniform width required for <br />particular item to be installed, sufficiently wide to provide ample working <br />room. Provide minimum 6 in. clearance on each side of pipe or conduit. <br />1. Excavate trenches to depth indicated or required for indicated flow <br />lines and invert elevations. <br />2. Where rock is encountered, carry excavation 6 in. below scheduled <br />elevation and backfill with a 6 in. layer of crushed stone or gravel <br />prior to installation of pipe. <br />3. For pipes or conduit 5 in. or less, excavate to indicated depths. <br />Hand excavate bottom cut to accurate elevations and support pipe <br />or conduit on undisturbed soil. <br /> <br />4. For pipes or conduit 6 in. or larger, tanks and other work indicated <br />to receive subbase, excavate to subbase depth indicated, or, if not <br />otherwise indicated, to 6 in. below bottom of work to be supported. <br />5. Except as otherwise indicated, excavate for exterior water-bearing <br />piping so top of piping is minimum 3'-6" below finished grade. <br />6. Grade bottoms of trenches as indicated, notching under pipe bells <br />to provide solid bearing for entire body of pipe. <br /> <br />I. <br /> <br />Do not backfill trenches until tests and inspections have been made and <br />backfilling authorized by Engineer. <br /> <br />02200-3 <br /> <br />06-5723 <br />