My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />D. When existing ground surface has a density less than that specified for <br />particular area classification, break up ground surface, pulverize, <br />moisture-condition to optimum moisture content, and compact to required <br />depth and percentage of maximum density. <br /> <br />E. Place backfill and fill materials in layers of 8 in. loose depth for material <br />compacted by heavy compaction equipment, and 4 in. in loose depth for <br />material compacted by hand operated tampers. <br /> <br />F. Before compaction, moisten or aerate each layer as necessary to provide <br />optimum moisture content. Do not place backfill or fill material on <br />surfaces that are muddy, frozen, or contain frost or ice. <br /> <br />G. Place backfill and fill materials evenly adjacent to structures, without <br />wedging against structures or displacement of piping or conduit. <br />Compaction equipment used within 10ft. of buried walls and soil <br />supported structures shall not exceed 2000 Ibs. <br /> <br />3.04 GRADING <br /> <br />A. Grading Outside Building Lines: Grade areas adjacent to building lines to <br />drain away from structures and to prevent ponding and as follows: <br />1. Finish to within not more than 0.10 ft. above or below required <br />subgrade elevations. <br />2. Walks: Shape surface to line, grade and cross-section, with finish <br />surface not more than 0.10 ft. above or below required subgrade <br />elevation. <br />3. Pavements: Shape surface to line, grade and cross-section, with <br />finish surface 1/2 in. above or below required subgrade elevation. <br /> <br />B. Grading Surface of Fill under Building Slabs: Grade smooth and even, <br />free of voids, compacted as specified, and to 1/2 in. below required <br />elevation. <br /> <br />3.05 FIELD QUALITY CONTROL <br /> <br />A. Contractor will engage soil testing and inspection service for quality <br />control testing during earthwork operations. <br /> <br />B. Allow testing service to inspect and approve subgrades and fill layers <br />before further construction work is performed. <br /> <br />C. If in opinion of Engineer, based on testing service reports and inspection, <br />subgrade or fills which have been placed below specified density, provide <br />additional compaction and testing at no additional expense to Owner. <br /> <br />04/08 <br /> <br />02200-5 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.