My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 02817 <br /> <br />CLEARING AND GRUBBING <br /> <br />PART 1 - GENERAL <br /> <br />1.01 SCOPE OF WORK <br /> <br />A. Work specified in this Section consists of Clearing and Grubbing within <br />areas specified in the Contract Documents or as directed by the Owner's <br />representative. Work under this Section includes removal and disposal of <br />all designated trees, palms, brush, stumps, grass, roots, and other such <br />protruding objects. Also included is the removal and disposal of fencing, <br />existing pavement, and debris not required to remain or to be salvaged <br />that is necessary to prepare the area for the proposed improvements. <br />Contractor shall notify all utility companies or utility owners (both public or <br />private) of their intent to perform such work and shall coordinate field <br />location of utility lines prior to commencement of construction. <br /> <br />B. Other miscellaneous work considered necessary for the complete <br />preparation of the overall project site is also included under this Section. <br />Work includes, but is not limited to, the following: <br />1. Leveling and restoration of terrain outside the limits of construction <br />for purposes of facilitating maintenance and other post- <br />construction operations. <br />2. Trimming of certain trees and shrubs within project limits for <br />utilization in subsequent landscaping of the project. <br />3. Plugging or sealing of culvert pipes or other structures to prevent <br />erosion or collapse of adjacent soils. <br /> <br />1.02 SPECIFICATIONS AND STANDARDS REFERENCE <br /> <br />A. Where supplementary specifications or standards such as ASTM, AWWA, <br />AASHTO, etc.are referenced, such references shall be latest edition. <br /> <br />PART 2 - PRODUCTS - Not Used. <br /> <br />PART 3 <br /> <br />EXECUTION <br /> <br />3.01 CLEARING AND GRUBBING <br /> <br />A. Clearing and Grubbing shall consist of complete removal and disposal of <br />all items stated in Article 1.01 which are not specified for removal under <br />other items of the contract. <br /> <br />04/08 <br /> <br />02817-1 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.