My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />D <br />I <br />I <br />I <br />m <br />I <br />m <br />I <br />I <br />- <br />I <br />I <br />D <br />I <br />- <br /> <br />3 . 8 DISPOSAL OF MATERIALS <br /> <br />A. Timber, stump, roots, brush, boulders, rubbish, and other objectionable <br />material resulting from work specified in this Section shall be disposed of <br />off-site in locations provided by the Contractor. <br /> <br />3.09 OWNERSHIP OF MATERIALS <br /> <br />A. Except as may be otherwise stated in the Contract Documents, all <br />buildings, structures, appurtenances and other materials removed by the <br />Contractor shall become the property of the Contractor, to be disposed of <br />in areas provided by him. <br /> <br />3.10 METHOD OF MEASUREMENT <br /> <br />A. General: For the various items of work specified in this Section when <br />listed as a separate pay item, payment shall be made by the unit price or <br />the lump sum amount as established in the Contract Documents. Where <br />no separate pay item is established, the cost of all such work shall be <br />included in the various scheduled items of work specified in the Contract <br />Documents, except as provided below. <br /> <br />B. Clearing and Grubbing: Measurement of Clearing and Grubbing shall <br />include only the areas specified in the Contract Documents that are <br />required to be cleared to permit the construction of the various items or <br />work. Areas that area cleared for convenience, access, or other purposes <br />that are not a requirement of construction will not be measured for <br />payment. <br /> <br />C. Selective Clearing and Grubbing: Measurement of Selective Clearing and <br />Grubbing shall include all areas shown in the plans or designated in the <br />field by the Owner's representative. This measurement shall include the <br />total area within the limits of Selective Clearing and Grubbing and no <br />deduction shall be made for areas in which desirable trees and brush are <br />designated to remain. Where the limits of Selective Clearing and <br />Grubbing are shown on the Plans or otherwise established in the Contract <br />Documents but no separate pay item established, the measurement of <br />such work shall be included in the quantity or lump sum amount of <br />"Clearing and Grubbing". <br /> <br />D. Special Clearing and Grubbing: Measurement of Special Clearing and <br />Grubbing shall include all areas shown in the plans or designated in the <br />field by the Owner's representative. This measurement shall include only <br />actual areas cleared by the hand method and shall not include areas <br />cleared by other methods or areas that remain in their original condition. <br /> <br />04/08 <br /> <br />02817-4 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.