My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />II <br /> <br />3.11 <br /> <br />04/08 <br /> <br />B. When the tests on control specimens of concrete fall below the required <br />strength, the Engineer will permit check tests for structure in accordance <br />with ASTM Methods C42 and C39. In case of failure of the latter, the <br />Engineer, in addition to other recourses, may require, at the Contractor's <br />expense, load tests on anyone of the slabs, beams, and columns in <br />which such concrete was used. Test need not be made until concrete has <br />aged 60 days. <br /> <br />C. Slabs or beams, under load test, shall be loaded with their own weights <br />plus a super-imposed load of 2 times design live load. The load shall be <br />applied uniformly over portion being tested in approved manner, and left <br />in position for 24 hours. The structure shall be considered satisfactory if <br />deflection "D" in feet, at end of 24-hour period does not exceed value: <br /> <br />D equals 0.001 (L x L)/t <br /> <br />in which "L" is span in feet, "t" is depth of slab or beam in inches. <br /> <br />D. If deflection exceeds "D" in the above formula, the concrete shall be <br />considered faulty unless within 24 hours after removal of the load, slab or <br />beam under test recovers at least 75% of observed deflection. <br /> <br />E. Should the strength of test cylinders fall below 60% of the required <br />minimum 28 day strength, the concrete shall be rejected and shall be <br />removed and replaced. <br /> <br />PATCHING AND REPAIRS <br /> <br />A. It is the intent of these Specifications to require that forms, mixture of <br />concrete and workmanship shall be such that concrete surfaces, when <br />exposed, will require minimal finishing as specified in Paragraph 3.05 <br />above. <br /> <br />B. As soon as the forms have been stripped and the concrete surfaces <br />exposed, fins and other projections shall be removed, recesses left by the <br />removal of form ties (except where ties are left in place during <br />sandblasting) shall be filled and surface defects which do not impair <br />structural strength shall be repaired. Clean all exposed concrete surfaces <br />and adjoining work stained by leakage of concrete, to approval of the <br />Engineer. <br /> <br />C. Immediately after removal of forms remove plugs and break off metal ties <br />as required by Paragraph 3.06. Holes are then to be promptly filled upon <br />stripping as follows: Moisten the hole with water, followed by a 1/16 inch <br />brush coat of neat cement slurry mixed to the consistency of a heavy <br />paste. Immediately plug the holes with 1 1.5 mixture of cement and <br />concrete sand mixer slightly damp to the tough Oust short of "balling"). <br />03300-15 06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.